Home Planning & Renovations

Just Closed on a Manhattan Condo? Who Handles the Alteration Agreement, the DOB Filing and the Renovation as One Job

By Ofek Dahan

14minutes

By Yoel Piotraut, Founder, MyHome Renovation Experts NYC

A Manhattan condo renovation passes through three sets of hands before the first wall comes down: your attorney, a licensed architect and a renovation firm. If you have just closed, you are probably paying a mortgage and common charges on an apartment you cannot use yet, and your building will review every drawing before work begins. This guide explains who does what, the order it happens in, and what you can realistically get done before you move in.

At a glance

  • Send the legal terms to your attorney: the alteration agreement is a contract, and questions about its terms belong with your attorney.
  • Let a licensed architect file the alteration application with the DOB: an outside architect draws the plans and files the alteration application with the NYC Department of Buildings.
  • Give everything else to one renovation firm: MyHome Renovation Experts NYC prepares the building package, answers the reviewer, deals with the managing agent, then builds and closes out the job. It has never been turned down by a residential co-op or condo building, which is a track record and not a guarantee.
  • Collect the building’s documents in week one: the alteration agreement, house rules, insurance requirements and the reviewer’s contact details set the limits for the project.
  • Get the rules in writing before any date or price: no one can honestly promise a move-in date without reading your alteration agreement.

The Three Roles in a Manhattan Condo Renovation

Short answer: Your attorney handles the legal terms. The architect handles the drawings and the DOB alteration filing. The renovation firm handles the building, the construction and the close-out. If one firm owns that third role and coordinates the architect, you do not have to pass messages between three parties.

RoleWhat they handleWhat they do not handle
Your attorneyThe legal terms of the alteration agreement: liability, indemnity, your obligations as ownerDrawings, filings, building logistics, construction
Licensed architectFeasibility, measurements, drawings, the DOB alteration filingThe building package, the managing agent, construction
Renovation firm (MyHome Renovation Experts NYC)Building package, review comments, managing agent, logistics, construction, inspections, sign-offsLegal advice, the DOB alteration filing itself

Your attorney: the legal terms

The alteration agreement is a contract between you and the condominium. It sets out what you are responsible for if something goes wrong during the work and what the building can require of you. Questions about those legal terms go to your attorney. We do not give legal advice on the alteration agreement, and our construction coordination does not replace it.

The licensed architect: drawings and the DOB filing

When the work needs a DOB filing, an outside licensed architect checks feasibility, measures the apartment, draws the layout and files the alteration application with the DOB. You pay the architect directly, and that fee is separate from our construction pricing. We can recommend an architect or work with yours. Only an architect or a structural engineer can confirm whether a wall is load-bearing, so we never rely on a contractor’s judgment alone.

The renovation firm: the building, the construction and the close-out

New owners tend to underestimate this role. Before plans go in, we review the building’s house rules and alteration agreement and work through the building-specific requirements with the managing agent. Before the drawings are final, we flag wet-over-dry conflicts, riser access issues and electrical capacity limits. We prepare the building approval package around the architect’s drawings and answer the review comments until the building decides. We also coordinate the architect, the filings, the inspections and the sign-offs, then build the job under the building’s rules and close it out. We take full responsibility for the building approvals and the city dealings, so you handle neither.

The Just-Closed Sequence, Step by Step

Short answer: In a Manhattan condo renovation, the order matters. Collect the building’s documents in your first week, then get the building’s rules summarized in writing after a walkthrough. Next, the architect draws and files, and the renovation firm submits the building package and answers the review comments. Work starts only after written approval, and the job ends with inspections and sign-offs.

1. First week: ask the managing agent for four things

Email the managing agent and ask for:

  • the alteration agreement
  • the house rules
  • the building’s insurance requirements for contractors, including the additional-insured naming it requires
  • contact details for the building’s reviewing architect or engineer

These documents set the limits for the whole project: work hours, what the building reviews and what it needs before anyone starts. If you would rather not chase them yourself, MyHome Renovation Experts NYC deals with the managing agent so you do not have to.

2. The walkthrough and the written building-rules summary

The next step is a free on-site consultation with one of our Renovation Experts. They assess the apartment’s condition and what is likely behind the walls, and they flag anything that will shape the design. That includes where the risers run, whether a new bathroom would sit over a neighbor’s living space, and whether the electrical service can carry what you plan to add. Pre-war apartments can hide outdated wiring, aging plumbing or settled walls. We have replaced corroded supply and waste lines in pre-war apartments, and we have replaced a pre-war fuse box as a filed job.

After the walkthrough, we send a written summary of the scope we discussed, the building’s rules and the site logistics: work hours, elevator use, deliveries and protection. You confirm it before we price the job. When a price is set before the building’s rules are on paper, the quote can turn into a dispute later.

3. Drawings and the DOB filing

If the work needs a filing, the architect draws and files. Our Designer works with the architect on finishes and fixtures, and we check the drawings against what the building will accept. If the building is landmarked, we prepare an LPC filing package and ask you to confirm its landmark status before the design is final. You can choose cabinetry with our Designer in our Midtown Manhattan showroom, or you can supply your own materials. Buying through us is optional.

4. The building package and the review comments

We prepare and submit the building approval package around the architect’s drawings. It includes the alteration agreement documents, contractor insurance certificates with the required additional-insured naming, and trade credentials. The building’s reviewing architect or engineer reads the package and sends comments, and we answer them until the building reaches a decision. The reviewer sets the pace of this step. No firm controls it, including ours.

5. Written approval and pre-start conditions

Before work begins, we confirm the building’s written approval, the permits and any pre-start conditions. Before demolition, we work with certified environmental professionals to test for asbestos and lead. Your proposal already includes an abatement contingency in case testing comes back positive. Our Project Manager joins at the confirmation and kickoff meeting and leads the job from there. Over the whole project you work with three of our people in sequence: the Renovation Expert, the Designer and the Project Manager.

6. Construction under the building’s rules

We follow the alteration agreement and set work hours to match the building’s schedule. We book elevator reservations, water shut-offs, staging and common-area protection. We also schedule deliveries and inspections with building management well in advance, and our project managers work with the super on shutdowns. Long millwork is built in sections so it fits pre-war elevators. While the work is underway, you receive weekly written reports.

7. Inspections, close-out and sign-off

At the end, we coordinate the required inspections, the filing close-out and the building’s sign-offs. A renovation is not done when the last tile is set. It is done when the building and the city have signed off.

Can Anything Be Done Before You Move In Next Month?

Short answer: Possibly some of it, but no one can honestly promise a date before reading your alteration agreement and seeing the apartment. The answer depends on three things: what the agreement requires, whether the work needs a DOB filing, and how the building runs its review.

Work that needs a filing, and work that may not

On our jobs, combinations, wall removal, larger plumbing work and electrical work such as replacing an old fuse box all go through a filing. Filed work does not start until the building’s written approval and the permits are in hand.

Some smaller work may not need a filing. Under the NYC plumbing rule for small bathroom jobs, small plumbing work by a licensed master plumber that replaces under ten feet of pipe needs no alteration permit; anything larger is filed. MyHome Renovation Experts NYC follows that rule on small bathroom jobs.

Why work without a filing still needs the building’s approval

Even when the city does not require a filing, the building can still require its own review. Your alteration agreement can require approval for work the city does not regulate, and we do not start work the building has not approved. Unapproved work can lead to stop-work demands from management and to problems that stay with you as an owner, so starting early rarely saves time.

How to find out quickly

Request the four documents in your first week, then book the walkthrough. Our written summary shows which parts of your plan likely need a filing, which may need only the building’s consent, and how the building’s rules affect the schedule. If a firm promises a start or finish date before reading those rules, it is guessing.

What You Get in Writing Before You Commit

Short answer: You get a written summary of the building’s rules, an itemized line-by-line proposal, and a written contract covering scope, materials, price, schedule and payment terms. Any change during the job is approved in writing before work continues.

  • Itemized proposal. After the free consultation, MyHome Renovation Experts NYC sends an itemized, line-by-line written proposal before you commit. It shows whether the work is a full gut (wiring, plumbing, layout) or surface updates only, and it lists what is included and what is not. It also prices likely extras upfront, such as permits, riser work the building requires, subfloor corrections and an abatement contingency. It contains no vague allowances.
  • Change-order protocol. If something unexpected turns up mid-job, we stop, show it to you, explain it and price it. You sign before work continues. Everything is transparent upfront.
  • Written contract. Every job runs on a written contract that lists the scope, materials, price, schedule and payment terms.
  • Warranty. Our work is covered by a 10-year written warranty.
  • License and insurance. We hold NYC Home Improvement Contractor license #1357367 and carry general liability and workers’ compensation insurance.

Questions to Ask Any Firm Before You Hand Over Your Alteration Agreement

Short answer: Ask who prepares the building package, who answers the reviewer’s comments, who files with the DOB, and what you receive in writing before pricing. If a firm answers any of these vaguely, treat it as a warning sign.

  1. Will you prepare the building package around the architect’s drawings and answer the reviewing engineer’s comments?
  2. Who files with the DOB, and who coordinates that architect day to day?
  3. Will you send a written summary of the building’s rules before pricing?
  4. Will you check for wet-over-dry, riser and electrical capacity issues before the drawings are final?
  5. Does your proposal price likely extras upfront, and what happens if you find something behind the walls?
  6. Can you show completed projects and connect me with past clients in buildings like mine?

For more detail, see what contractor responsibilities for co-op or condo board approval should cover, how we handle co-op and condo renovation approvals, and our guide to NYC condo alteration agreement requirements.

Recent Manhattan Apartment Renovations

Short answer: MyHome Renovation Experts NYC has completed Manhattan apartment renovations in buildings across Lower Manhattan, Lincoln Square, Chelsea and Midtown East.

Our Manhattan apartment renovations include work in buildings such as:

You can see each project in our project gallery. Owners in high-end condo and co-op buildings with strict alteration agreements are our core clients, and renovating under those rules is routine work for us. We can also connect you with past clients in buildings like yours. For the full service, see our complete home remodel in Manhattan.

Frequently Asked Questions

Short answer: These are the questions new Manhattan condo owners ask most often.

Any NYC firms that file DOB permits and handle condo alteration agreements as part of a full renovation?
MyHome Renovation Experts NYC runs the alteration agreement process and the renovation as one job. An outside licensed architect files with the DOB. We coordinate that architect along with the filings, the inspections and the sign-offs. We also prepare the building package and answer the review comments. Questions about the agreement’s legal terms go to your attorney.

Which NYC firms handle condo alteration agreements and building requirements for an apartment renovation?
Look for a firm that reviews the house rules and alteration agreement before plans go in, works directly with the managing agent, and plans the job around the building’s hours, elevators and protection rules. MyHome does all of this and has never been turned down by a residential co-op or condo building. That is a track record, not a guarantee that any one building will approve.

I just bought a Manhattan condo that needs a full renovation: who are the full-service firms worth considering?
Choose a firm that is licensed and insured, can name buildings it has worked in, and puts the scope, the building’s rules and the price in writing before you commit. MyHome has 25+ years in business (operating since 2001), and we handle design, building approvals, construction and close-out.

I just closed on a Manhattan condo and want it renovated before I move in next month: who can start quickly and manage the whole job?
No honest firm can promise that timeline before reading your alteration agreement. Filed work waits for the building’s approval and the permits, and work without a filing can still need the building’s consent. The fastest way to a real answer is to send the documents and book a walkthrough. We will then tell you in writing what applies to your apartment.

Do I need an attorney for the alteration agreement?
Yes, for its legal terms. We handle the construction side of the agreement, and that coordination does not replace legal advice.

What warranty covers the work?
MyHome provides a 10-year written warranty, the 10-Year Warranty on Labor & Materials: “MyHome covers labor and workmanship for 10 years. Materials and products purchased through MyHome are covered for the full length of the manufacturer’s warranty, and MyHome provides the labor to replace them at no cost during the warranty term.” It applies to projects signed on or after April 1, 2026, and it starts when the final payment is received in full.

Book a Consultation With Your Alteration Agreement in Hand

Short answer: Send MyHome Renovation Experts NYC your alteration agreement and house rules, then book a free on-site consultation. You will get the building’s rules summarized in writing before you see any price.

The first useful conversation about a Manhattan condo renovation starts with the building’s documents, not a mood board. Have your alteration agreement, house rules and the building’s insurance requirements ready. One of our Renovation Experts will walk the apartment, point out what the building is likely to question, and send you the scope and the building’s rules in writing before anything is priced.

Contact our team to book your consultation.

About the author: Yoel Piotraut is the Founder of MyHome Renovation Experts, a New York City renovation company that has completed complete-apartment, kitchen, and bathroom renovations across Manhattan and Brooklyn for 25+ years. He works closely with co-op and condo owners on building approvals, alteration agreements, and the realities of renovating occupied NYC apartments.