Home Planning & Renovations

Brooklyn Heights Brownstone Full Renovation: One Team for Design, LPC and DOB Filings, and Construction

By Ofek Dahan

13minutes

A Brooklyn Heights brownstone full renovation has three jobs: a design that someone has priced, filings with the Landmarks Preservation Commission (LPC) and the Department of Buildings (DOB) that keep the project moving, and construction run by someone you can hold to account. If those jobs sit with three unconnected parties, the owner ends up as the project manager. A better choice is one firm that runs design, permits and construction as one team. That firm should tell you in writing who signs the drawings, who files with LPC and the DOB, who builds, and how the budget and changes are controlled. MyHome Renovation Experts NYC has been in business for 25+ years and runs full brownstone and townhouse renovations in Brooklyn and Manhattan this way, including full home renovation in Brooklyn Heights.

At a glance

  • Hire one team for all three jobs: MyHome coordinates the design, the architect’s DOB filing, the LPC package and construction.
  • Know who signs and files: a licensed outside architect that MyHome coordinates draws and files the plans, and the client pays the architect directly.
  • Confirm landmark status before the design is final: MyHome prepares the LPC filing package around drawings made for the review the house will face.
  • Get an itemized proposal before committing: likely extras, including an abatement contingency, are priced upfront, and any change is approved in writing before work proceeds.
  • Follow the job in writing: the Project Manager leads construction from the kickoff meeting, weekly written reports are MyHome’s practice, and completed work carries a 10-year written warranty.

Who Does What on a Brooklyn Heights Brownstone Full Renovation

Ask every firm on your shortlist these eight questions:

  1. One contract or several?
  2. Who is the architect of record?
  3. Who files with the DOB and LPC?
  4. Who builds?
  5. How detailed is the budget?
  6. How do change orders work?
  7. Can I speak with references?
  8. Who is the project manager?

Our answer to each is below, so you can hold every firm to the same standard.

One contract or several?

Two agreements, with one team coordinating both. Our construction work runs on a written contract that lists the scope, materials, price, schedule and payment terms. On work that needs a DOB filing, you hire and pay the outside licensed architect directly. The architect’s fees are separate from our construction pricing, so you always know what you pay the architect and what you pay us. We stay involved with the architect through the filings, inspections and sign-offs, so you are not managing the architect on your own.

Who is the architect of record?

A licensed outside architect. We do not employ architects. We can recommend one, or we can work with an architect you already have. The architect checks feasibility, measures the house, draws the plans and files them. Our Designer works with the architect on finishes and fixtures, so the drawings and the selections describe the same house.

Some brownstone questions are structural. Can a wall come out? Can a stair move? How wide can an opening at the rear be? Only an architect or structural engineer can confirm whether a wall is load-bearing. We do not rely on a contractor’s judgment for that call. We coordinate the structural work and the filings that follow.

Who files with the DOB and with LPC?

  • DOB: The outside architect files the plans with the DOB.
  • LPC: For a landmarked house, we prepare the LPC filing package around the architect’s drawings and coordinate it with the DOB filing.
  • City dealings: We take full responsibility for city and DOB dealings, so you do not have to chase either agency yourself.

If your brownstone has been converted into co-op or condo units, there is also a board to satisfy. We prepare the building approval package and handle the board’s review comments until it reaches a decision. We have handled board approvals for Brooklyn Heights brownstone conversions, and we have never been turned down by a residential co-op or condo building. That is our track record, not a promise about your board. Questions about the legal terms of an alteration agreement go to your attorney. Our coordination does not replace legal advice.

Who builds the house?

We run construction. We hold NYC Home Improvement Contractor license #1357367 and carry general liability and workers’ compensation insurance. The city’s Department of Consumer and Worker Protection issues that license. Before work begins, we confirm three things:

  • The approvals are in hand.
  • The permits are issued.
  • Any pre-start conditions are met.

How detailed is the budget?

Line by line. After a free on-site consultation, we send an itemized written proposal before you commit. The proposal:

  • Shows whether the work is a full gut (wiring, plumbing, layout) or surface updates only.
  • Lists what is included and what is not.
  • Prices likely extras upfront, such as permits, subfloor corrections and an abatement contingency.
  • Uses no vague allowances.

How do change orders work?

Every change is approved in writing before the work is done. Likely extras are already priced in the proposal. If something unexpected turns up mid-job, we follow four steps:

  1. Work on that item stops.
  2. We bring you to see the condition.
  3. We explain the reason and give you the exact price.
  4. You sign before that work proceeds.

We do not replace first and bill later. Before you compare proposals, read what should happen when a contractor finds something unexpected behind the walls.

Can I speak with references?

Yes. We can show you completed projects and connect you with past clients in buildings like yours. Ask for that introduction before you sign.

Who is the project manager?

A MyHome Project Manager, who joins at the confirmation and kickoff meeting. From there, the Project Manager leads the job on site. The full three-person sequence is described below.

The LPC Step in a Brooklyn Heights Landmark District

Short answer: Most of Brooklyn Heights lies within a designated historic district, so most permitted work on a brownstone there involves LPC as well as the DOB. We prepare the LPC filing package for landmarked buildings. We also have you confirm the building’s landmark status before the design is final, so the drawings are made for the review they will actually face. We do not guarantee an LPC outcome or a review timeline.

Confirm landmark status before the design is final

On a Brooklyn Heights brownstone full renovation, a design drawn without knowing what LPC will review can come back for rework, and rework costs time and money. Once you confirm the landmark status, the architect and our Designer shape the plan around it. The LPC package is then prepared from drawings that already account for that review.

How LPC review fits interior and exterior work

LPC review is not limited to the front facade:

  • Interior work: In a historic district, interior work that needs a DOB permit generally needs an LPC permit as well, even when nothing changes outside.
  • Exterior work: Changes to the windows, stoop, cornice or rear facade, or a rooftop addition, are reviewed for how they affect the district.
  • Review path: Some applications are approved at staff level. Others go to a public hearing before the Commission.

The architect works out which path your scope takes early, as the LPC package is prepared. For a broader walkthrough, see our NYC landmark renovation guide.

What Is Likely Behind the Walls of an Old Brooklyn Row House

Short answer: Old Brooklyn row houses can hide outdated wiring, aging supply and waste lines, and walls that have settled out of level. Older materials may also contain asbestos or lead. We assess what is likely behind the walls at the consultation and price the likely extras in the proposal. Before demolition, we test for asbestos and lead with certified environmental professionals.

Wiring, plumbing and settled walls

At the consultation, our Renovation Expert looks at the house’s condition and at what is probably hidden. Older buildings can reveal:

  • Outdated wiring.
  • Corroded supply and waste lines.
  • An old fuse box.
  • Plaster cracked by walls that have settled.

We have replaced corroded supply and waste lines, and we have replaced a pre-war fuse box as a filed job. Whatever the walls reveal goes through the change-order steps above.

The finish work has to suit an old house too. We resurface old plaster with Level 5 skim coating. We measure cabinets and built-ins on site and scribe them to walls and floors that are out of level, so they sit tight against the house as it actually is.

Asbestos and lead testing before demolition

Before demolition, we work with certified environmental professionals to test for asbestos and lead. If testing finds either, those professionals remove or encapsulate the material, and we manage the clearance reports. Because testing can come back positive, the proposal includes an abatement contingency from the start.

New York City requires an asbestos investigation before many alteration and demolition permits are issued. Federal rules also govern lead-safe work practices in homes built before 1978.

The Three People You Work With on Our Team, in Order

Short answer: You work with three of our people in sequence:

  1. Renovation Expert: the consultation and the proposal.
  2. Designer: design and selections, alongside the outside architect.
  3. Project Manager: construction, from the kickoff meeting through close-out.

Renovation Expert: consultation, written summary, itemized proposal

At the free on-site consultation, our Renovation Expert assesses the house and the scope you have in mind. Afterward, we send a written summary of the scope we discussed and the site logistics, such as work hours, deliveries and protection for what stays. You confirm that summary before we price the job. The itemized, line-by-line proposal follows. Transparent upfront means you see what is included, what is not, and which likely extras are already priced before you commit.

Designer: design, selections and the architect’s drawings

Our in-house Designer works with the outside architect so the plan, the finishes and the fixtures match. You can select cabinetry with our designers in our Midtown Manhattan showroom, which carries Plain & Fancy custom cabinetry and custom millwork. You may also supply your own materials. Buying through our purchasing team is optional.

Project Manager: kickoff, weekly reports, close-out

The Project Manager joins at the confirmation and kickoff meeting and leads the job from there. Our practice is to send you a weekly written report on progress. At the end, we coordinate the required inspections, the filing close-out and the sign-offs. Completed work carries our 10-year written warranty.

The Same Process in Cobble Hill and Park Slope

We also serve Cobble Hill and Park Slope, and the same process applies there:

  • Confirm landmark status early.
  • Have the outside architect file the plans.
  • Have us prepare the LPC package if the house is landmarked.
  • Control the budget with an itemized proposal and written change orders.

Which review your scope faces depends on the house and its designation.

Our Brooklyn Heights and Cobble Hill Projects

These are completed MyHome Renovation Experts NYC projects nearby, each with photos in our project gallery:

See all Brooklyn projects. Ask us to connect you with a past client in a building like yours.

Brownstone Renovation Questions Brooklyn Owners Ask

Before hiring, most owners ask the same questions. Who files with LPC? Do I pay the architect separately? Can I live in the house during the work? How are changes handled? What will it cost? Our answers are below.

Who files the LPC application for my brownstone?

We prepare the LPC filing package around the outside architect’s drawings. We coordinate it with the DOB filing, which the architect makes. You confirm the building’s landmark status before the design is final. We do not guarantee an LPC decision or how long the review takes.

Do I pay the architect separately?

Yes. On DOB-filed work, you pay the outside licensed architect directly, and those fees are separate from our construction pricing. We can recommend an architect or work with your own. Either way, we coordinate the filings, inspections and sign-offs.

Can I live in my brownstone during a full renovation?

It depends on the scope and how the work is sequenced across floors. If wiring and plumbing are replaced throughout and walls are opened on every level, staying is much harder than if work is limited to some floors. Raise this at the consultation, because it shapes the schedule and the site logistics in your written summary.

How are changes and surprises handled?

Likely extras are priced in the proposal upfront. If something unexpected appears, we stop work on that item and show it to you. We explain the reason and the exact price, then wait for your signature before proceeding. Changes you request yourself are also approved in writing before the work is done.

How will I know how the job is going?

Our practice is to send a weekly written report on progress. From the kickoff meeting onward, the Project Manager is your contact on site.

Can I talk to past clients?

Yes. We can show you completed projects and connect you with past clients in buildings like yours.

What does a full brownstone renovation cost?

The cost depends on your house, not on an average. The main drivers are:

  • Whether the work is a full gut or surface updates.
  • How much wiring and plumbing must be replaced.
  • What asbestos and lead testing finds.
  • Which approvals the scope requires.
  • The finishes you choose.

Final pricing depends on scope, finishes, and building requirements. For typical NYC budget ranges and the factors behind them, see our NYC renovation cost guide. Your own number comes from the itemized proposal after the on-site consultation.

What warranty comes with the work?

Our completed work carries a 10-year written warranty.

Talk to Us About Your Brooklyn Heights Brownstone

Short answer: Start with a free on-site consultation. First you get a written scope summary to confirm. Then you get an itemized proposal that shows what is included, what is not, and which likely extras are already priced, all before you commit.

If you are planning a Brooklyn Heights brownstone full renovation, MyHome Renovation Experts NYC can take it from the first walkthrough to the final sign-off as one team:

  • Our Renovation Expert scopes the house.
  • Our Designer works with the outside architect on the plan and selections.
  • We prepare the LPC package and handle the city dealings.
  • Our Project Manager runs construction, and our practice is to send you weekly written reports.

Ask to see completed projects and to speak with past clients in buildings like yours. Contact our team to book your free on-site consultation.


Sources

  1. NYC Department of Consumer and Worker Protection, “License Application Checklist: Home Improvement Contractor”: https://www.nyc.gov/site/dca/businesses/license-checklist-home-improvement-contractor.page
  2. NYC Landmarks Preservation Commission, “Applications”: https://www.nyc.gov/site/lpc/applications/applications.page
  3. U.S. Environmental Protection Agency, “Lead Renovation, Repair and Painting Program”: https://www.epa.gov/lead/renovation-repair-and-painting-program