Kitchen Renovation at 353 4th Avenue, Park Slope

Kitchen Renovation at 353 4th Avenue, Park Slope

Designer Eran
Project manager Ofek
Renovation Expert Eran

Projects › Brooklyn › 353 4th Avenue

Completed project · Park Slope, Brooklyn, NY

A kitchen renovation that set out to keep everything that still worked: all four appliances, the floor, and every fixture position. It took seven weeks of correspondence with the building to establish what a job like that is still required to replace, and the answer was more than anyone expected.

Renovated kitchen with white shaker cabinets, a hexagonal stone backsplash, black granite counters, stainless appliances and a round glass table with red chairs
Every appliance in this photograph was already here. The cabinets, counters and backsplash are the new part.

Job record

Location
Park Slope, Brooklyn, NY 11215
Building
353 4th Avenue
Scope
Kitchen renovation, cabinets, counters, backsplash and painting
Kept
Refrigerator, range, microwave, dishwasher and the existing wood floor
Approval
Condominium board approval, March 2022
Completed
2022

A cosmetic kitchen, and why a building may disagree

The scope of work for this apartment is unusually short, and the reason is a list headed Keeping: refrigerator, range, microwave, dishwasher, and the existing wood floor. Everything plumbed or wired stays where it is. The sink, the dishwasher, the range and the faucet all go back in their existing locations. The kitchen floor is kept. The light switch and the outlet are replaced in position. What actually changes is the cabinets, the counters, the backsplash, the under-cabinet lighting, the ceiling fixture and the paint.

That was put to the managing agent in January 2022 as a cosmetic kitchen project, on the basis that no pipes were being moved and no wires run, and therefore no permits were needed. The reply set out the building’s own precedent: in other kitchen alterations here, all branch piping had been required to be replaced back to the risers, and the renovated kitchen area fully waterproofed.

Waterproofing a kitchen floor means taking the floor up. Keeping the floor and waterproofing it are mutually exclusive, and the request to keep it went to the board as a question in its own right.

The corner of the kitchen, showing an undermount black sink set into black granite beneath a hexagonal stone backsplash, with under-cabinet lighting above
The sink stayed in its corner. Moving it would have meant opening the floor, which was the one thing this job was built to avoid.

Seven weeks of correspondence, in order

What follows is the actual sequence, because the shape of it is more useful than any summary. Every date is from the email record in the job file.

  1. 12 January — the opening request

    MyHome sends the scope of work and asks for the alteration agreement and the insurance requirements. The managing agent replies the same day: the building has no formalised alteration agreement, the scope is going to the building’s architect, and meanwhile they need certificates of insurance, licences, any permits, the expected duration of the job, and confirmation that a water shut-down will be needed.

  2. 18–20 January — the submission

    Insurance requirements arrive. MyHome submits the scope, the anticipated time frame, the trade licences and vaccination certificates for every worker, with the position stated plainly: this is a cosmetic kitchen project, no pipes are being touched and no wires run, so permits should not be required, and all appliances will remain in place.

  3. 20 January — the building’s precedent

    The agent answers within two hours. Other kitchen alterations in this building have been required to replace all branch piping back to the risers and to waterproof the kitchen area completely. Keeping the existing floor would prevent the waterproofing being installed, so the board will have to rule on it. If the answer is no, a set of floor plans showing waterproofing details and saddle locations will be needed. In either case: an LAA filing for the plumbing, an electrical permit, and a written statement on whether the electrical load increases.

  4. 27 January — a conditional yes on the floor

    The board votes that the existing floor can remain, subject to the other conditions, but wants verification that waterproofing was installed when that floor was laid. MyHome replies the same day that the floor was changed in 2010 and is not original, and sends a photograph.

  5. 11 February — nobody has the records

    The agent has no records from 2010, having taken over management of the building in 2018. Their conclusion is practical: a section of floor will have to be lifted during demolition to find out. The remaining conditions are restated — confirm the branch piping replacement, file the LAA and the electrical permit, and state the electrical load.

  6. 16 February — confirmed, point by point

    MyHome answers each condition in the agent’s own wording: the branch piping will be replaced, an LAA and an electrical permit will be filed, there is no increase in electrical load, and a section will be lifted at demolition to confirm the waterproofing.

  7. 2 March — approval, with a contingency

    The board approves the work per the architect’s latest review, with two additions. If waterproofing is found to be missing or compromised once the floor is opened, the flooring must be replaced and waterproofing installed. And an apartment shut-off valve is to be installed along with the branch line replacement.

Seven weeks, from a request for paperwork to an approval, on a job whose visible output is cabinets and a countertop.

What the building added to a cabinet job

The plumbing that came out of that correspondence is worth setting against the original position of no pipes being touched. A licensed master plumber’s proposal covers new shut-off valves, check valves and water hammer arrestors, and new hot, cold, waste and vent lines from the fixtures’ existing connections, serving the kitchen sink, the dishwasher and the gas range. Plumbing permits were pulled, inspections performed, and the work signed off with the Department of Buildings.

None of that is visible in a photograph. All of it is behind the cabinets in the pictures below, and all of it was added between the first email and the last.

The run of white shaker cabinets from above the counter down to the dishwasher and gas range, with the wood floor visible below
The wood floor is the original. It was laid in 2010 and the board voted to let it stay.
The kitchen seen past a chrome sputnik chandelier, with the glass table, the range and the hexagonal backsplash behind it
A new ceiling fixture on the existing point, one of only four electrical items in the scope.
Close view of the hexagonal stone backsplash tile, the brushed steel faucet, the black granite counter and an outlet set into the tile
The hexagons are cut stone, not ceramic, so each one carries its own grain and colour.

The part that was actually the design

With the layout fixed by what was staying, the work the eye sees is material. White shaker wall and base cabinets on a plywood substrate, with crown and baseboard molding. Black granite counters templated to the run. A backsplash of cut stone hexagons, each one carrying its own grain, which is what stops a single-colour kitchen from reading flat. Under-cabinet lighting on both runs, two new GFCI outlets in the existing positions, and a new ceiling fixture on the existing point.

The chrome sputnik chandelier seen from below, its arms and bare bulbs against a white ceiling
Replacing the ceiling fixture was in the scope. Moving it was not.
The sputnik chandelier from a lower angle, showing the ceiling canopy and the stem it hangs from
It hangs over the table rather than the worktop, which is why it could go on the existing point.

Materials and finishes

Kept in place

ElementSpecification
RefrigeratorExisting, retained
RangeExisting, retained and reconnected to the gas line
MicrowaveExisting, retained
DishwasherExisting, retained and reconnected
Kitchen floorExisting wood floor, laid in 2010, retained by board approval
Sink positionExisting corner location

Cabinets and surfaces

ElementSpecification
CabinetsWhite shaker wall and base cabinets on a plywood substrate
MoldingCrown and baseboard molding to the cabinet runs
CountertopsBlack granite, templated to the run and reinforced at the cabinet tops
BacksplashCut stone hexagonal mosaic, grouted
Sink and faucetNew undermount sink, faucet, spout and drain in the existing location

Electrical

ElementSpecification
OutletsTwo GFCI outlets replacing the existing outlets in position
SwitchNew light switch in the existing position
Ceiling lightNew fixture on the existing point
Under-cabinet lightingInstalled to both runs of the kitchen
LoadNo increase; confirmed in writing to the managing agent

Plumbing added by the building

ElementSpecification
Branch linesHot, cold, waste and vent replaced from the fixtures back toward the risers
ValvesNew shut-offs and check valves, plus an apartment shut-off valve
Water hammer arrestorsInstalled on hot and cold
Fixtures servedKitchen sink, dishwasher and gas range on the existing roughing
FilingsLAA plumbing filing and an electrical permit, with inspections and DOB sign-off

Finishing

ElementSpecification
ProtectionHallways and common areas prepared, vents and radiator connections taped, apartment plastic-sheeted
PaintingKitchen work area, primer and two coats, no skim coating

Dates and conditions are taken from the email record between MyHome and the building’s managing agent held in the job file. Materials are from the signed scope of work and the plumbing proposal.

The result

4 of 4appliances kept
7 weeksfrom first email to approval
0fixtures moved

More MyHome projects in Brooklyn and Manhattan

Questions this project answers

Can I renovate my kitchen without moving the plumbing or replacing the appliances?

Yes, and this job is the clearest example of it. The scope carries a list headed Keeping: refrigerator, range, microwave, dishwasher and the existing wood floor. The sink, dishwasher, range and faucet all went back in their existing locations, the outlets and switch were replaced in position, and the ceiling fixture went back on the existing point. What changed was the cabinets, the counters, the backsplash, the under-cabinet lighting and the paint. Keeping working appliances and a sound floor is the single largest saving available in a kitchen renovation, because it is what keeps the job out of the floor and out of the walls.

If my renovation is only cosmetic, do I still need permits and board approval?

Very often yes, and the building decides that, not you. MyHome put this job to the managing agent as a cosmetic kitchen project needing no permits. The building’s answer was that other kitchen alterations there had been required to replace all branch piping back to the risers and to waterproof the kitchen floor, and that an LAA plumbing filing, an electrical permit and a written statement on electrical load would be needed regardless. The finished job included new hot, cold, waste and vent branch lines, new valves and water hammer arrestors, permits and a DOB sign-off. Ask the building what its precedent is before you price the work, because the precedent is what you will be held to.

How long does condominium board approval take for a kitchen renovation?

Seven weeks on this project, from the first email on 12 January 2022 to approval on 2 March 2022, and none of that time was wasted. It went: request for paperwork, insurance requirements issued, submission of scope and licences, the building setting out its precedent, a board vote on keeping the floor, a four-week gap while the agent searched for records that turned out not to exist, a point-by-point written confirmation of every condition, and then approval. Build that into your schedule as real time before demolition, not as an administrative formality that runs alongside the design.

Can I keep my existing floor in a kitchen renovation if the building wants waterproofing?

Sometimes, and it is worth asking rather than assuming. Waterproofing a kitchen floor requires taking the floor up, so keeping the floor and waterproofing it cannot both happen. Here the board voted that the existing floor could remain, on the condition that it could be verified as having been waterproofed when it was laid in 2010. When no records from 2010 could be found, the practical answer was to lift a section during demolition and look, with a standing condition that if the waterproofing was missing or compromised, the floor would have to come out and be done properly. That is a reasonable way to resolve it, and it is worth proposing if you meet the same wall.

What is a stone hexagonal backsplash, and does it date?

It is a mosaic of hexagonal tiles cut from stone rather than moulded in ceramic, supplied on mesh sheets and grouted like any tile. The reason to use it in a kitchen of white cabinets and black counters is that stone carries its own grain and colour variation, so the backsplash is the one surface in the room with movement in it. That variation is also what makes it more forgiving than a flat-colour tile: marks and shadows read as part of the material. Sealing matters, since stone is porous in a way that glazed ceramic is not.

Planning something like this?

MyHome has renovated apartments, co-ops, condos and townhomes across Manhattan and Brooklyn for more than 25 years. Complete the short questionnaire to start an estimate.

Let’s design your home together

Complete the short questionnaire to kick off your estimation process

Get an Estimate

Recent Projects

Just a moment...