Projects › Upper West Side › 160 West 66th Street
Completed project · Upper West Side, New York, NY
A full apartment renovation on the Upper West Side: a galley kitchen taken back to the building risers, a primary bathroom rebuilt to keep both a tub and a walk-in shower, and twenty nine new recessed fixtures set into soffits framed for the purpose. The kitchen was deliberately not opened into the living space.
Job record
- Location
- Upper West Side, New York, NY 10023
- Building
- 160 West 66th Street
- Scope
- Full apartment renovation
- Rooms
- Kitchen, primary bathroom, powder room, bedroom, living room, hallway
- Also
- Apartment-wide lighting, millwork, base moldings and paint
- Brands
- Bosch, Miele, Caesarstone, Kohler, Toto, Lacava, Robern, AXOR, Blanco, Akdo, Daltile, Lutron
- Completed
- 2025
The apartment before the work
A high-floor apartment with two exposures, parquet flooring throughout and radiator enclosures running under every window. The layout worked. What did not work was everything attached to it: a galley kitchen with oak fronts and dark floor tile, a primary bathroom finished in beige marble from the tub deck to the walls, and lighting that amounted to a handful of wall sconces and some recessed cans in the hallway.
The brief covered the two wet rooms, the millwork and the lighting, and left the plan alone. No walls were moved. The one structural option on the table, demolishing the wall between the kitchen and the living space, was priced and declined.
The two rooms that carried the real work look like this at the start.
What the crew did, in order
Protection first, then demolition
Hallways and common areas were re-cleaned at the end of every day, with vents, exhaust access and radiator connections taped off throughout. Then the kitchen and primary bathroom came out: cabinets, countertops, sinks, faucets, the radiator, every appliance, the ceiling lighting and all of the tile.
Both wet rooms taken back to the risers
This is the part that does not show in a photograph. In the kitchen, new hot and cold lines and new waste and vent lines were run as branch replacements all the way back to the building risers, with new shut-off valves at two points, check valves, water hammer arrestors and code pipe insulation. The primary bathroom got the same treatment plus a new two inch drain line to the riser for the shower stall and a new lead pan under it.
Electrical moved where the old positions were not legal
The microwave hood circuit was relocated because the existing one sat too low to meet code. Kitchen switches and outlets were replaced with GFCI devices, and the fridge side of the kitchen was rewired in low voltage for LED under-cabinet lighting.
Walls opened to brace for grab bars
Three locations in the primary bathroom were opened up so that grab bars could be blocked and fixed legally rather than screwed into tile. A niche was framed in the shower once demolition showed where it could go, and a waterproofed ledge was framed along the long wall at the tub.
Waterproofing, then a new subfloor
A new mud-job subfloor went in to take the tile. Floors were waterproofed with Laticrete 9235 and carried eight inches up the walls, full height inside the shower.
Soffits framed for the lighting
Rather than cut into the existing ceiling, new soffits were framed along the long wall and the wall shared with the kitchen. Power was pulled from the existing wall sconce circuits, so no new home runs were needed. Three recessed cans went into the shared-wall soffit and six into the long wall, both on switches that already existed.
Tile, stone and cabinetry
Wall tile full height through the shower and half height elsewhere, floor tile and saddles, then the vanity, the medicine cabinets and the kitchen cabinetry. Countertops came with installation included, so that was the one trade MyHome did not carry.
Millwork, moldings and paint
Built-in seating at both living room windows, a bookcase along the east wall, and closet-style built-ins in the bedroom nook. Two hundred and fifty six linear feet of new sanitary base molding, caulked and sealed, then the whole apartment painted.
The kitchen
The footprint is unchanged. What changed is every surface and every line feeding it. Lower cabinets are Lauriermax in Almi Silver, with a garbage pull-out under the sink on the right. The uppers are the same maker in a grey-beige Tossini Elm melamine, and the tall run that hides the refrigerator carries the same face.
Counter and backsplash are one material, Caesarstone 4120 Raven with an eased edge, which is why the backsplash reads as the counter turned up the wall rather than as a separate element. The sink is a Blanco Precis 24 in Silgranit, Coal Black, and the faucet is a Hansgrohe Focus HighArc two-spray pull-down in matte black at 1.75 gallons per minute.
Appliances were bought by the client and installed here: a panel-ready Bosch refrigerator, a Bosch stainless gas range, a Bosch microwave hood and a panel-ready Miele dishwasher. Under the cabinets, five Richelieu Atom LED puck lights at 4000K run off a single 24 volt dimmable supply. The GFCI outlets on the backsplash are black; the ones serving the appliances are white and sit out of sight.
The primary bathroom
The interesting decision here is what was kept. A Manhattan bathroom this size usually loses the tub to gain a decent shower. This one kept both, which meant two complete thermostatic valve assemblies rather than one.
The tub is a Kohler Underscore, sixty by thirty, right drain, set in an alcove, with a Kohler Clearflo slotted overflow drain in brushed nickel. The shower stall runs on Infinity Drain components: a cast iron clamping drain and floor drain under a matte black four inch cover.
Shower and tub each get an AXOR One thermostatic module with a two-function trim in brushed nickel. The shower carries an AXOR One 75 showerhead at 1.75 gallons per minute; both get a handshower on a forty nine inch metal hose with its own holder and outlet. The tub spout is an AXOR Uno straight. The lavatory faucet is an AXOR One single-hole at 1.2 gallons per minute, set in a Lacava Kubitop solid surface top over a Lacava Kubista vanity.
Above it, two Robern M Series Reserve medicine cabinets, both surface mounted: a thirty by thirty over the sink with the electric upgrade, which brings interior lighting, USB charging, outlets and a sliding magnification mirror, and a twenty four by thirty over the toilet. Three Robern Tenor fluted lights in polished nickel sit left, center and right of them. The toilet is a Toto Aquia IV with an integrated Washlet S7, which is why electric was run to it.
Tile is Akdo Mason twelve by twenty four in Steel Soft on the walls, an Akdo Aplomb Mini Dots accent in white matte, and a Daltile one inch hex in matte ebony on the floor. Grout was specified three ways to match: Mist on the field, Bright White on the accent, Raven on the floor. The shower curb, the room saddle and the shelf over the tub are all Caesarstone Raven, the same stone as the kitchen counter.
The powder room
The powder room was the one wet space not taken back to the studs. It got a decorative rebuild instead: Cole and Son Acquario wallpaper in black and multi, carried onto the closet door as well, a silver leaf ceiling supplied by the client, and trim paint matched to the wallpaper rather than chosen first.
Bedroom, hallway and living room
Outside the wet rooms the work was millwork, lighting and electrical. In the bedroom, power was run for electric blinds, a built-in went in at the window to give seating, up to two outlets were relocated, a wall sconce was moved, and a linen-style wallcovering went on the long wall only.
The living room got built-in seating under both windows and a built-in bookcase along the east wall. The radiator enclosures were rebuilt in white and topped with Caesarstone Vivid White, three pieces in total, two in the living room and one in the bedroom, with satin aluminum grilles.
Lighting across the apartment is twenty two WAC Lotos four inch adjustable recessed fixtures in the new soffits, selectable from 2700K to 5000K, plus seven Lithonia WF4 units replacing existing cans in the hallway and bedroom one for one. Switching is Lutron Maestro, thirteen dimmers across the living areas and bedroom. Two change orders moved parts of that package from white to gray and then to slate.
Three door handles were replaced with Emtek round knobs on disk rosettes in satin nickel, the coat closet got a custom mirror, and the laundry closet a primed shelf and brackets.
Materials and finishes
Kitchen
| Element | Specification |
|---|---|
| Lower cabinets | Lauriermax 24-B075-B, Almi Silver CL, with garbage pull-out under sink |
| Upper cabinets | Lauriermax 24-B075-A, Barcelo melamine, grey beige Tossini Elm |
| Countertop and backsplash | Caesarstone 4120 Raven, eased edge |
| Sink | Blanco Precis 24 Silgranit, 442928, Coal Black, 24 in |
| Faucet | Hansgrohe Focus HighArc, 4505670, matte black, 2-spray pull-down, 1.75 GPM |
| Refrigerator | Bosch B09IB91NSP, panel ready |
| Gas range | Bosch HGI8056UC, stainless steel |
| Microwave hood | Bosch HMV3053U, stainless steel |
| Dishwasher | Miele G5482SCVI, panel ready |
| Under-cabinet lighting | Richelieu 126124900 Atom LED puck, 3W, 24V, 4000K, five fixtures |
| Lighting supply | Richelieu DH2424, 24V dimmable, 12W, six LED ports |
| Switches and outlets | Lutron CAR-15-GFST-BL GFCI, CARS-15-TR-WH, MACL-153M-BL dimmer |
Primary bathroom
| Element | Specification |
|---|---|
| Bathtub | Kohler Underscore K-20201-RA-0, white, 60 x 30 x 19 in, right drain, alcove |
| Bath drain | Kohler Clearflo K-7271-BN, brushed nickel, slotted overflow |
| Shower drain | Infinity Drain UCP 42 clamping and CDIQ 42 floor drain, cast iron |
| Shower drain cover | Infinity Drain LQ4-2-BK, matte black, 4 x 4 in |
| Shower and tub valves | AXOR One 45710181 thermostatic module rough, two required |
| Shower and tub trim | AXOR One 45712821, brushed nickel, 2-function |
| Showerhead | AXOR One 48497821, brushed nickel, Showerhead 75, 1-jet, 1.75 GPM |
| Handshower | AXOR One 48652821, brushed nickel, 1-jet, 1.75 GPM, two required |
| Handshower hose | AXOR 28112820, brushed nickel, 49 in metal, two required |
| Tub spout | AXOR Uno 45410821, brushed nickel, straight |
| Lavatory top | Lacava Kubitop K30 G 01, white, 30 x 22 x 6.5 in, single faucet hole |
| Vanity cabinet | Lacava Kubista KUB-W-30B-08, white, 29.75 x 20.875 x 22 in |
| Lavatory faucet | AXOR One 48001821, brushed nickel, single-hole 70, 1.2 GPM |
| Lavatory drain | Lacava 7100-13OF NI, brushed nickel |
| Toilet | Toto Aquia IV MW6464726CEMFGN#01, cotton, Washlet+ S7, 1.28 and 0.9 GPF |
| Flush actuator | Toto THU848#BN, brushed nickel |
| Medicine cabinet, sink | Robern M Series Reserve MR3030D4FPE2, 30 x 30 x 4 in, electric upgrade |
| Medicine cabinet, toilet | Robern M Series Reserve MR2430D4FPE0, 24 x 30 x 4 in |
| Medicine cabinet lighting | Robern Tenor JLA30FKSC3D77, polished nickel, fluted, 30 in, 3000K, three fixtures |
| Wall tile | Akdo Mason PO2466-1224ST, Steel Soft, 12 x 24 in, 10 mm, 197.54 sq ft |
| Accent tile | Akdo Aplomb Mini Dots CR2685-MINI00, white matte, 20 x 48 in, 96.85 sq ft |
| Floor tile | Daltile UP221HEXMS1P, matte ebony, 1 in hex, 4.4 mm, 67.68 sq ft |
| Tile trim | Schluter Schiene A100AT, satin nickel, 3/8 in |
| Stone curb, saddle and shelf | Caesarstone 4120 Raven, eased edge |
| Ceiling light | Lithonia WF4, white, 4 in round |
| Accessories | AXOR Universal SoftSquare 42846820 paper holder; Universal Circular 42813820 grab bars; 42811820 hooks; 42860820 towel bar, 24 in |
Powder room
| Element | Specification |
|---|---|
| Wallpaper | Cole and Son Acquario 97/10048.CS.0, black and multi, three rolls, also on closet door |
| Ceiling | Silver leaf, supplied by the client |
| Trim paint | Benjamin Moore semi-gloss, matched to the wallpaper |
Apartment
| Element | Specification |
|---|---|
| Recessed lighting | WAC Lotos WAC2319505, 4 in round, 2700K to 5000K selectable, twenty two fixtures |
| Recessed lighting, replacement | Lithonia WF4, white, 4 in round, seven fixtures |
| Closet lighting | Huxe Astrid WPL2453749, 37 in LED |
| Wall sconces | Ingo Maurer Lucellino NT, white and brass, supplied by the client |
| Bedroom millwork | Lauriermax 24-B075-D, white, push-to-open |
| Living room millwork | Lauriermax 24-B075-C, white, push-to-open |
| Radiator cover tops | Caesarstone 1111 Vivid White, eased edge, three pieces |
| Radiator covers | Lauriermax 24-B183-A, B and C, white |
| Radiator grilles | Architectural Grille AG20 B, satin aluminum, 5 x 48 in, three |
| Base molding | Garden State Lumber SAN414 sanitary base, primed, 9/16 x 4.25 in, 256 linear ft |
| Flooring | Bolon Tilia 895.10, supplied by the client |
| Door handles | Emtek ROU 5209 US15 round knob, disk rosette, satin nickel, three |
| Switching | Lutron Maestro MACL-153M, thirteen dimmers, plus CA-1PS switches |
| Paint | Benjamin Moore, eggshell walls, OC-65 Chantilly Lace flat ceilings and semi-gloss trim |
Two materials change orders were issued during the job, on 25 April and 7 May 2024. Both were switch and outlet finishes: part of the Lutron package moved to gray, then to slate, and a towel bar and seven further recessed fixtures were added.
The result
More MyHome projects in Manhattan
Questions this project answers
What are change orders, and how do I avoid being overcharged by my contractor?
A change order is a written amendment to what was agreed. This job had two, on 25 April and 7 May 2024, and both are worth looking at because neither was a surprise cost: they were finish swaps. Part of the Lutron switch and outlet package moved from white to gray and then to slate, a 24 inch towel bar was added and seven more recessed fixtures went in. The protection against being overcharged is that every item sits on a materials list with a manufacturer, a model number and a quantity before work starts, so a change is a visible difference against a document rather than a line on an invoice. MyHome’s materials list also carries a written returns clause: if you change your mind on a specified item, you pay restocking and shipping; if the mistake is the supplier’s or MyHome’s, you do not.
How do I protect my building’s hallways and keep my neighbors happy during a renovation?
It is written into the scope before anything comes out. On this job that meant preparing hallways and common areas as the building required and keeping them prepared for the whole project, taping off vents, exhaust access and radiator connections so dust does not travel through the building’s systems into other apartments, cleaning the hallways at the end of every working day including lifting the Masonite, and removing all garbage from the site by whatever route the building allows. In a co-op or condo the neighbors are also the people who sit on the board, so this is not a courtesy.
My co-op board wants insurance certificates and paperwork. Who actually handles that?
The contractor does, and it should be in the drawings before you sign. The general notes on this project state that before work commences the contractor files all required insurance certificates with the Department of Buildings, obtains all required permits and pays all fees to the governing New York City agencies, and coordinates every work procedure with local authorities, building management and the board of directors. Plumbing and electrical are carried out by separately licensed trades who obtain their own permits, inspections and sign-offs. If a firm cannot show you that language in their own documents, ask who is filing.
How do I make a co-op bathroom safer for an aging parent?
The decision has to be made before the tile goes on. In this bathroom the walls were opened in three locations and blocking was fixed between the studs so that grab bars could be mounted legally and take real weight; two AXOR Universal Circular bars went in, one in the shower and one at the tub. A grab bar screwed into tile and plasterboard alone will hold a towel and not a person. Electric was also run for a Toto Washlet seat, and the shower is a walk-in with a handshower on a 49 inch hose as well as a fixed head. Once the room is grouted, retrofitting any of this means opening it up again.
How long will I be without a working bathroom, if I only have one?
This apartment had two, a primary bathroom and a powder room, and only the primary was taken back to the studs, so the household kept a working toilet and basin throughout. If you have only one bathroom the honest answer is different: the room is out of use from demolition until the fixtures are set and the waterproofing and tile have cured, and on a job of this specification that is weeks rather than days, because new drain lines were run to the building risers, a new lead pan was set, a new mud-job subfloor went in and the floor was waterproofed before any tile. Ask for that sequence as dates before you agree a start.