160 West 66th Street Apartment Renovation

160 West 66th Street Apartment Renovation

Designer 160 West 66th Street Apartment Renovation
Project manager Danny
Renovation Expert Ben

Projects › Upper West Side › 160 West 66th Street

Completed project · Upper West Side, New York, NY

A full apartment renovation on the Upper West Side: a galley kitchen taken back to the building risers, a primary bathroom rebuilt to keep both a tub and a walk-in shower, and twenty nine new recessed fixtures set into soffits framed for the purpose. The kitchen was deliberately not opened into the living space.

Renovated galley kitchen with pale oak tall cabinets, a stainless gas range, a dark stone backsplash and a corner window over the sink
The kitchen kept its original galley footprint. Opening it into the living space was priced as an option and not taken.

Job record

Location
Upper West Side, New York, NY 10023
Building
160 West 66th Street
Scope
Full apartment renovation
Rooms
Kitchen, primary bathroom, powder room, bedroom, living room, hallway
Also
Apartment-wide lighting, millwork, base moldings and paint
Brands
Bosch, Miele, Caesarstone, Kohler, Toto, Lacava, Robern, AXOR, Blanco, Akdo, Daltile, Lutron
Completed
2025

The apartment before the work

A high-floor apartment with two exposures, parquet flooring throughout and radiator enclosures running under every window. The layout worked. What did not work was everything attached to it: a galley kitchen with oak fronts and dark floor tile, a primary bathroom finished in beige marble from the tub deck to the walls, and lighting that amounted to a handful of wall sconces and some recessed cans in the hallway.

Empty living room before work, with parquet floor, a wall of windows and a radiator enclosure below them
The parquet and the radiator enclosures are the starting point for every room in this apartment.

The brief covered the two wet rooms, the millwork and the lighting, and left the plan alone. No walls were moved. The one structural option on the table, demolishing the wall between the kitchen and the living space, was priced and declined.

Empty corner room before work with parquet flooring and windows on two walls
Two exposures at a corner, which is why the built-in seating ended up under both windows.
Window wall before work with a long radiator enclosure running beneath the glass
This is the run that became a stone-topped bench.
Empty room before work with bare white walls, a wall sconce and parquet flooring
The wall sconces were reused. Their circuits were pulled forward to feed the new soffit lighting.
Empty room before work showing parquet flooring, a window and a radiator enclosure
The radiator enclosures were rebuilt rather than removed, and topped in stone.
Empty interior room before work looking through to a hallway, lit by a two-arm wall sconce
The hallway beyond is where seven recessed fixtures were swapped one for one.
Empty room before work with a wall sconce and an opening through to a corridor
The opening to the corridor was left exactly where it was.
Empty room before work with bags on the parquet floor and a radiator enclosure under the window
Taken on a walkthrough, before protection went down.
Original closet interior before work with white melamine shelving and a hanging rail
The closet interiors were replaced with deeper built-ins.

The two rooms that carried the real work look like this at the start.

Original kitchen before work, with oak cabinets, a white range and dark tile flooring
The original kitchen ran the same length as the new one. Everything inside it came out.
Original kitchen before work seen toward the hallway, showing the sink, range and microwave above it
The old microwave sat low over the range. That position is what forced the electrical to move.

What the crew did, in order

  1. Protection first, then demolition

    Hallways and common areas were re-cleaned at the end of every day, with vents, exhaust access and radiator connections taped off throughout. Then the kitchen and primary bathroom came out: cabinets, countertops, sinks, faucets, the radiator, every appliance, the ceiling lighting and all of the tile.

  2. Both wet rooms taken back to the risers

    This is the part that does not show in a photograph. In the kitchen, new hot and cold lines and new waste and vent lines were run as branch replacements all the way back to the building risers, with new shut-off valves at two points, check valves, water hammer arrestors and code pipe insulation. The primary bathroom got the same treatment plus a new two inch drain line to the riser for the shower stall and a new lead pan under it.

  3. Electrical moved where the old positions were not legal

    The microwave hood circuit was relocated because the existing one sat too low to meet code. Kitchen switches and outlets were replaced with GFCI devices, and the fridge side of the kitchen was rewired in low voltage for LED under-cabinet lighting.

  4. Walls opened to brace for grab bars

    Three locations in the primary bathroom were opened up so that grab bars could be blocked and fixed legally rather than screwed into tile. A niche was framed in the shower once demolition showed where it could go, and a waterproofed ledge was framed along the long wall at the tub.

  5. Waterproofing, then a new subfloor

    A new mud-job subfloor went in to take the tile. Floors were waterproofed with Laticrete 9235 and carried eight inches up the walls, full height inside the shower.

  6. Soffits framed for the lighting

    Rather than cut into the existing ceiling, new soffits were framed along the long wall and the wall shared with the kitchen. Power was pulled from the existing wall sconce circuits, so no new home runs were needed. Three recessed cans went into the shared-wall soffit and six into the long wall, both on switches that already existed.

  7. Tile, stone and cabinetry

    Wall tile full height through the shower and half height elsewhere, floor tile and saddles, then the vanity, the medicine cabinets and the kitchen cabinetry. Countertops came with installation included, so that was the one trade MyHome did not carry.

  8. Millwork, moldings and paint

    Built-in seating at both living room windows, a bookcase along the east wall, and closet-style built-ins in the bedroom nook. Two hundred and fifty six linear feet of new sanitary base molding, caulked and sealed, then the whole apartment painted.

The kitchen

The footprint is unchanged. What changed is every surface and every line feeding it. Lower cabinets are Lauriermax in Almi Silver, with a garbage pull-out under the sink on the right. The uppers are the same maker in a grey-beige Tossini Elm melamine, and the tall run that hides the refrigerator carries the same face.

Full-height pale oak cabinetry running to the ceiling beside a window, with a stone counter and drawer bank below
The tall cabinet run hides the refrigerator, which is panel-ready rather than stainless.
Close view of a matte black pull-down kitchen faucet against a dark stone backsplash, above a black composite sink
Counter, backsplash and sink are three different materials chosen to read as one: Caesarstone Raven against Blanco Coal Black.

Counter and backsplash are one material, Caesarstone 4120 Raven with an eased edge, which is why the backsplash reads as the counter turned up the wall rather than as a separate element. The sink is a Blanco Precis 24 in Silgranit, Coal Black, and the faucet is a Hansgrohe Focus HighArc two-spray pull-down in matte black at 1.75 gallons per minute.

The same kitchen seen from the entry, showing the run of base cabinets, the range and the microwave hood above it
The microwave hood sits higher than the one it replaced. Its electrical had to be moved because the old position did not meet code.

Appliances were bought by the client and installed here: a panel-ready Bosch refrigerator, a Bosch stainless gas range, a Bosch microwave hood and a panel-ready Miele dishwasher. Under the cabinets, five Richelieu Atom LED puck lights at 4000K run off a single 24 volt dimmable supply. The GFCI outlets on the backsplash are black; the ones serving the appliances are white and sit out of sight.

The primary bathroom

The interesting decision here is what was kept. A Manhattan bathroom this size usually loses the tub to gain a decent shower. This one kept both, which meant two complete thermostatic valve assemblies rather than one.

Original primary bathroom before work with a drop-in tub, beige marble surfaces and a vanity
Beige marble on every surface, including the tub deck. All of it was removed to the studs.
Original glass shower enclosure before work, tiled in beige marble with a hinged door
The shower stall stayed in the same place. Its drain line was replaced back to the riser.

The tub is a Kohler Underscore, sixty by thirty, right drain, set in an alcove, with a Kohler Clearflo slotted overflow drain in brushed nickel. The shower stall runs on Infinity Drain components: a cast iron clamping drain and floor drain under a matte black four inch cover.

Renovated primary bathroom with a white alcove bathtub, a wall-hung vanity, a toilet and a glass shower enclosure
Tub and walk-in shower both survived the rebuild. Each has its own thermostatic valve.
The primary bathroom from the doorway, showing the vanity, toilet and glass shower over a black hexagonal tile floor
The floor is a one inch matte black hex. The walls are a soft gray twelve by twenty four, so the room reads calm rather than busy.
Close view of a brushed nickel handshower on a wall bracket above a white bathtub with a slotted overflow drain
The tub gets its own handshower and hose. So does the shower stall. They are the same fitting, bought twice.

Shower and tub each get an AXOR One thermostatic module with a two-function trim in brushed nickel. The shower carries an AXOR One 75 showerhead at 1.75 gallons per minute; both get a handshower on a forty nine inch metal hose with its own holder and outlet. The tub spout is an AXOR Uno straight. The lavatory faucet is an AXOR One single-hole at 1.2 gallons per minute, set in a Lacava Kubitop solid surface top over a Lacava Kubista vanity.

The bathtub end of the primary bathroom with two surface-mounted medicine cabinets above the vanity and a stone shelf over the tub
Two medicine cabinets, not one: a thirty inch above the sink and a twenty four inch above the toilet.
Close view of the vanity top with a single-lever brushed nickel faucet and an integrated white basin
The basin and its top are one piece of solid surface, so there is no rim seam to clean.

Above it, two Robern M Series Reserve medicine cabinets, both surface mounted: a thirty by thirty over the sink with the electric upgrade, which brings interior lighting, USB charging, outlets and a sliding magnification mirror, and a twenty four by thirty over the toilet. Three Robern Tenor fluted lights in polished nickel sit left, center and right of them. The toilet is a Toto Aquia IV with an integrated Washlet S7, which is why electric was run to it.

Tile is Akdo Mason twelve by twenty four in Steel Soft on the walls, an Akdo Aplomb Mini Dots accent in white matte, and a Daltile one inch hex in matte ebony on the floor. Grout was specified three ways to match: Mist on the field, Bright White on the accent, Raven on the floor. The shower curb, the room saddle and the shelf over the tub are all Caesarstone Raven, the same stone as the kitchen counter.

The powder room

The powder room was the one wet space not taken back to the studs. It got a decorative rebuild instead: Cole and Son Acquario wallpaper in black and multi, carried onto the closet door as well, a silver leaf ceiling supplied by the client, and trim paint matched to the wallpaper rather than chosen first.

Original powder room before work with a pedestal sink and a wall of beige marble
The powder room was the one space not taken back to the studs.

Bedroom, hallway and living room

Outside the wet rooms the work was millwork, lighting and electrical. In the bedroom, power was run for electric blinds, a built-in went in at the window to give seating, up to two outlets were relocated, a wall sconce was moved, and a linen-style wallcovering went on the long wall only.

Bedroom with an upholstered bed against a cloud-patterned wallcovering, a window with a city view and a low cabinet run beneath it
The patterned wall is a single long wall. The other three were left plain so the room does not close in.
Bedroom wall of white push-to-open cabinetry with a television recessed into a central opening
The cabinet doors are push-to-open, so there is no handle to interrupt the run.
Floor-to-ceiling white cabinetry along a bedroom wall beside a window
The nook was fitted with closet-style built-ins rather than left as open floor.
Hallway with a fluted glass sliding panel on the left and a framed artwork at the far end
The hallway recessed lights were replaced in their existing positions, so no ceiling was opened here.

The living room got built-in seating under both windows and a built-in bookcase along the east wall. The radiator enclosures were rebuilt in white and topped with Caesarstone Vivid White, three pieces in total, two in the living room and one in the bedroom, with satin aluminum grilles.

Living room with gray leather seating, a corner of windows on two sides and a dining area with bookshelves beyond
Built-in seating runs under both windows, and the bookcase along the east wall is built in rather than freestanding.

Lighting across the apartment is twenty two WAC Lotos four inch adjustable recessed fixtures in the new soffits, selectable from 2700K to 5000K, plus seven Lithonia WF4 units replacing existing cans in the hallway and bedroom one for one. Switching is Lutron Maestro, thirteen dimmers across the living areas and bedroom. Two change orders moved parts of that package from white to gray and then to slate.

Three door handles were replaced with Emtek round knobs on disk rosettes in satin nickel, the coat closet got a custom mirror, and the laundry closet a primed shelf and brackets.

Materials and finishes

Kitchen

ElementSpecification
Lower cabinetsLauriermax 24-B075-B, Almi Silver CL, with garbage pull-out under sink
Upper cabinetsLauriermax 24-B075-A, Barcelo melamine, grey beige Tossini Elm
Countertop and backsplashCaesarstone 4120 Raven, eased edge
SinkBlanco Precis 24 Silgranit, 442928, Coal Black, 24 in
FaucetHansgrohe Focus HighArc, 4505670, matte black, 2-spray pull-down, 1.75 GPM
RefrigeratorBosch B09IB91NSP, panel ready
Gas rangeBosch HGI8056UC, stainless steel
Microwave hoodBosch HMV3053U, stainless steel
DishwasherMiele G5482SCVI, panel ready
Under-cabinet lightingRichelieu 126124900 Atom LED puck, 3W, 24V, 4000K, five fixtures
Lighting supplyRichelieu DH2424, 24V dimmable, 12W, six LED ports
Switches and outletsLutron CAR-15-GFST-BL GFCI, CARS-15-TR-WH, MACL-153M-BL dimmer

Primary bathroom

ElementSpecification
BathtubKohler Underscore K-20201-RA-0, white, 60 x 30 x 19 in, right drain, alcove
Bath drainKohler Clearflo K-7271-BN, brushed nickel, slotted overflow
Shower drainInfinity Drain UCP 42 clamping and CDIQ 42 floor drain, cast iron
Shower drain coverInfinity Drain LQ4-2-BK, matte black, 4 x 4 in
Shower and tub valvesAXOR One 45710181 thermostatic module rough, two required
Shower and tub trimAXOR One 45712821, brushed nickel, 2-function
ShowerheadAXOR One 48497821, brushed nickel, Showerhead 75, 1-jet, 1.75 GPM
HandshowerAXOR One 48652821, brushed nickel, 1-jet, 1.75 GPM, two required
Handshower hoseAXOR 28112820, brushed nickel, 49 in metal, two required
Tub spoutAXOR Uno 45410821, brushed nickel, straight
Lavatory topLacava Kubitop K30 G 01, white, 30 x 22 x 6.5 in, single faucet hole
Vanity cabinetLacava Kubista KUB-W-30B-08, white, 29.75 x 20.875 x 22 in
Lavatory faucetAXOR One 48001821, brushed nickel, single-hole 70, 1.2 GPM
Lavatory drainLacava 7100-13OF NI, brushed nickel
ToiletToto Aquia IV MW6464726CEMFGN#01, cotton, Washlet+ S7, 1.28 and 0.9 GPF
Flush actuatorToto THU848#BN, brushed nickel
Medicine cabinet, sinkRobern M Series Reserve MR3030D4FPE2, 30 x 30 x 4 in, electric upgrade
Medicine cabinet, toiletRobern M Series Reserve MR2430D4FPE0, 24 x 30 x 4 in
Medicine cabinet lightingRobern Tenor JLA30FKSC3D77, polished nickel, fluted, 30 in, 3000K, three fixtures
Wall tileAkdo Mason PO2466-1224ST, Steel Soft, 12 x 24 in, 10 mm, 197.54 sq ft
Accent tileAkdo Aplomb Mini Dots CR2685-MINI00, white matte, 20 x 48 in, 96.85 sq ft
Floor tileDaltile UP221HEXMS1P, matte ebony, 1 in hex, 4.4 mm, 67.68 sq ft
Tile trimSchluter Schiene A100AT, satin nickel, 3/8 in
Stone curb, saddle and shelfCaesarstone 4120 Raven, eased edge
Ceiling lightLithonia WF4, white, 4 in round
AccessoriesAXOR Universal SoftSquare 42846820 paper holder; Universal Circular 42813820 grab bars; 42811820 hooks; 42860820 towel bar, 24 in

Powder room

ElementSpecification
WallpaperCole and Son Acquario 97/10048.CS.0, black and multi, three rolls, also on closet door
CeilingSilver leaf, supplied by the client
Trim paintBenjamin Moore semi-gloss, matched to the wallpaper

Apartment

ElementSpecification
Recessed lightingWAC Lotos WAC2319505, 4 in round, 2700K to 5000K selectable, twenty two fixtures
Recessed lighting, replacementLithonia WF4, white, 4 in round, seven fixtures
Closet lightingHuxe Astrid WPL2453749, 37 in LED
Wall sconcesIngo Maurer Lucellino NT, white and brass, supplied by the client
Bedroom millworkLauriermax 24-B075-D, white, push-to-open
Living room millworkLauriermax 24-B075-C, white, push-to-open
Radiator cover topsCaesarstone 1111 Vivid White, eased edge, three pieces
Radiator coversLauriermax 24-B183-A, B and C, white
Radiator grillesArchitectural Grille AG20 B, satin aluminum, 5 x 48 in, three
Base moldingGarden State Lumber SAN414 sanitary base, primed, 9/16 x 4.25 in, 256 linear ft
FlooringBolon Tilia 895.10, supplied by the client
Door handlesEmtek ROU 5209 US15 round knob, disk rosette, satin nickel, three
SwitchingLutron Maestro MACL-153M, thirteen dimmers, plus CA-1PS switches
PaintBenjamin Moore, eggshell walls, OC-65 Chantilly Lace flat ceilings and semi-gloss trim

Two materials change orders were issued during the job, on 25 April and 7 May 2024. Both were switch and outlet finishes: part of the Lutron package moved to gray, then to slate, and a towel bar and seven further recessed fixtures were added.

The result

29new recessed fixtures
256 ftof new base molding
2rooms replumbed to the risers

More MyHome projects in Manhattan

Questions this project answers

What are change orders, and how do I avoid being overcharged by my contractor?

A change order is a written amendment to what was agreed. This job had two, on 25 April and 7 May 2024, and both are worth looking at because neither was a surprise cost: they were finish swaps. Part of the Lutron switch and outlet package moved from white to gray and then to slate, a 24 inch towel bar was added and seven more recessed fixtures went in. The protection against being overcharged is that every item sits on a materials list with a manufacturer, a model number and a quantity before work starts, so a change is a visible difference against a document rather than a line on an invoice. MyHome’s materials list also carries a written returns clause: if you change your mind on a specified item, you pay restocking and shipping; if the mistake is the supplier’s or MyHome’s, you do not.

How do I protect my building’s hallways and keep my neighbors happy during a renovation?

It is written into the scope before anything comes out. On this job that meant preparing hallways and common areas as the building required and keeping them prepared for the whole project, taping off vents, exhaust access and radiator connections so dust does not travel through the building’s systems into other apartments, cleaning the hallways at the end of every working day including lifting the Masonite, and removing all garbage from the site by whatever route the building allows. In a co-op or condo the neighbors are also the people who sit on the board, so this is not a courtesy.

My co-op board wants insurance certificates and paperwork. Who actually handles that?

The contractor does, and it should be in the drawings before you sign. The general notes on this project state that before work commences the contractor files all required insurance certificates with the Department of Buildings, obtains all required permits and pays all fees to the governing New York City agencies, and coordinates every work procedure with local authorities, building management and the board of directors. Plumbing and electrical are carried out by separately licensed trades who obtain their own permits, inspections and sign-offs. If a firm cannot show you that language in their own documents, ask who is filing.

How do I make a co-op bathroom safer for an aging parent?

The decision has to be made before the tile goes on. In this bathroom the walls were opened in three locations and blocking was fixed between the studs so that grab bars could be mounted legally and take real weight; two AXOR Universal Circular bars went in, one in the shower and one at the tub. A grab bar screwed into tile and plasterboard alone will hold a towel and not a person. Electric was also run for a Toto Washlet seat, and the shower is a walk-in with a handshower on a 49 inch hose as well as a fixed head. Once the room is grouted, retrofitting any of this means opening it up again.

How long will I be without a working bathroom, if I only have one?

This apartment had two, a primary bathroom and a powder room, and only the primary was taken back to the studs, so the household kept a working toilet and basin throughout. If you have only one bathroom the honest answer is different: the room is out of use from demolition until the fixtures are set and the waterproofing and tile have cured, and on a job of this specification that is weeks rather than days, because new drain lines were run to the building risers, a new lead pan was set, a new mud-job subfloor went in and the floor was waterproofed before any tile. Ask for that sequence as dates before you agree a start.

Planning something like this?

MyHome has renovated apartments, co-ops, condos and townhomes across Manhattan and Brooklyn for more than 25 years. Complete the short questionnaire to start an estimate.

Let’s design your home together

Complete the short questionnaire to kick off your estimation process

Get an Estimate

Recent Projects

Just a moment...