Kitchen and Tub-to-Shower Bathroom at 115 East 9th Street

Kitchen and Tub-to-Shower Bathroom at 115 East 9th Street

Designer Adam
Project manager Yoel
Renovation Expert Danny

Projects › Lower Manhattan › 115 East 9th Street

Completed project · Lower Manhattan, New York, NY

A kitchen and bathroom in Lower Manhattan, both rebuilt inside their existing footprints. The bathroom went from tub to shower in the same position. The kitchen is built entirely on narrow appliances, and the whole job hangs off a new circuit breaker panel moved out into the hallway.

Renovated galley kitchen with pale slab cabinets, a white quartz counter, a stainless range and a panel-ready refrigerator at the end of the run
Every appliance in this kitchen is narrower than standard. The range is twenty inches and the refrigerator twenty four.

Job record

Location
Lower Manhattan, New York, NY
Building
115 East 9th Street
Scope
Kitchen, electrical upgrade and a tub-to-shower bathroom conversion
Kitchen
Fisher and Paykel, Bosch, Premier, Summit, Silestone, Delta, Kraus, Daltile, Roca
Bathroom
Grohe, Toto, Fleurco, Silestone, Roca, Daltile, Infinity Drain, Swiss Madison
Notable
New circuit breaker panel relocated to the hallway outside the kitchen
Completed
2025

Before the work

A tight galley kitchen with a twenty inch range, a shallow dark counter and cabinets that had stopped closing properly, and a bathroom with a wall-hung sink, an alcove tub and a curtain rod. Neither room was failing. Both were simply out of space and out of outlets.

The original kitchen counter and gas range, crowded with pans, utensils and small appliances
A twenty inch range, a shallow counter, and nowhere to put anything down. The new layout keeps the same footprint.
The original kitchen sink and drainer on a dark counter, beside the range
The sink stayed in this position. The lines feeding it were replaced back to the risers.

The bathroom had no medicine cabinet and no opening in the wall for one, which turns out to matter. It did have a recessed hamper set into the wall, and that opening became the answer.

The original alcove tub with a shower curtain and beige tile to ceiling height
The tub was the only bathing option. Converting it to a shower is the whole point of this job.
The original bathroom looking toward the tub, showing the wall-mounted sink and tiled floor
The sink was wall-mounted with the trap exposed beneath it, which is what the new floating vanity conceals.
The original bathroom before work, with a wall-mounted sink, an alcove tub and beige square wall tile
A wall-hung sink, an alcove tub with a curtain rod, and tile to about shoulder height. All of it came out.

What the crew did, in order

  1. Move the electrical panel out of the kitchen

    The largest single decision on this job is invisible in every photograph. A new circuit breaker panel was installed in the hallway outside the kitchen, with the electrician choosing the exact position on site. To feed it, a soffit was framed, sheetrocked and spot-plastered over the entrance door and column to carry the run.

  2. Give the appliances their own circuits

    Dedicated lines were run to the refrigerator, the above-range microwave and the dishwasher, plus two above-counter GFCI duplex outlets. A further two GFCI duplexes were added above the counter and an outlet was spliced in for the gas range ignition. A kitchen with one shared circuit is the reason older apartments trip a breaker when the kettle and the toaster meet.

  3. Strip both rooms and replumb to the risers

    Kitchen and bathroom both went back to the shell. New shut-off valves, check valves and water hammer arrestors throughout, with new hot and cold branch lines run back to the building risers and, in the bathroom, new waste and vent lines as well. The dishwasher got a check valve beside the sink.

  4. Turn the tub into a shower in the same position

    A new lead pan and cement curb were set exactly where the alcove tub had been. No bench was built. Cement board went into the shower enclosure, a waterproof membrane over the shower walls, and another across the floor turned six inches up the walls.

  5. Use the hamper opening for the cabinet

    There was no medicine cabinet and no wall opening for one. Rather than cut a new one, the existing recessed hamper opening was reframed to take a semi-recessed storage cabinet with push-to-open doors, and the original hamper opening sealed. A 24 inch round mirror was centered over the vanity instead.

  6. Quiet the floors

    A glued acoustical underlayment went down under the tile in both rooms before anything else. In a pre-war building with neighbors directly below, that layer is the difference between a tiled floor and a drum.

  7. Finish the details that show

    Flat crown molding on top of the wall cabinets, a Rev-A-Shelf pull-out in the base run, tile trim at the exposed edges, and the phone and cable wires concealed inside the wall around the doorway rather than clipped along the skirting.

The kitchen

Cabinets are Executive in a slab front, Chalk White above and Oregon Pine below, with Top Knobs Europa pulls at three and five inches and a twelve inch Hartridge appliance pull. The counter is Silestone Ethereal Glow at three quarters of an inch, and the backsplash is a Roca White Ice Bright three by six with a sixteenth of an inch grout joint.

The kitchen from the entrance, showing the full run of cabinets, the floating shelves and the tiled floor
The wall cabinets are Chalk White and the bases Oregon Pine, so the room reads lighter at eye level than at the floor.
Close view of the range and the corner of the counter, with the sink and pull-down faucet beyond
The counter wraps the corner in one piece of Silestone, so there is no seam at the turn where the sink sits.

The appliances are the constraint and the achievement. A Fisher and Paykel RB2470BRV1 integrated refrigerator at 24 inches wide and just under 70 tall, panel ready with a reversible hinge so it fits flush into the cabinetry. A Premier P20S3102PS freestanding gas range at 20 inches. A Summit HC20SS ductless recirculating hood above it, also 20. A Bosch SPX68C73UC dishwasher, panel ready. None of them is a compromise unit; all of them are simply narrow.

Two pale floating shelves in the kitchen holding a bonsai, a woven basket and a bowl of fruit
The shelves replaced wall cabinets on the window side, which is what keeps the narrow end of the galley from closing in.

The sink is a 20 inch Kraus undermount in stainless under a Delta Essa pull-down faucet in polished chrome. The floor is Daltile Vapor Matte 12 by 24 on a Laticrete Light Pewter grout, and the ceiling light is a Maxim LED in white. Ceiling height through the kitchen is 96 and three quarter inches, which is what allows the wall cabinets to run high enough for crown.

The bathroom

The vanity is an Executive slab in Oregon Pine, floating, 23 and a half by 17 and a half inches, carrying a Swiss Madison ceramic top in white with a six inch Silestone Miami White backsplash. Beside it, the semi-recessed storage cabinet in Radiant White sits in what used to be the hamper.

The finished bathroom seen from the doorway, with the toilet, floating vanity, round mirror and the shower beyond
The shower stands exactly where the tub did. The curb and the lead pan under it are both new.
Renovated bathroom with a floating wood vanity, a round mirror, a glass shower enclosure and a toilet
The vanity floats. It is cleated to the wall rather than standing on the floor, which keeps the tile running underneath.

Fittings are Grohe in polished chrome throughout: a Lineare single-hole single-handle faucet at 1.2 gallons per minute, a thermostatic shower valve with a fixed head, and Essentials accessories for the paper holder, the 18 inch towel bar, the 12 inch grab bar, the toilet brush holder and the basket. A retractable Moen clothes line was fitted over the shower.

Walls are Roca Pro Ivory 12 by 24 to ceiling height in the shower and to about four feet elsewhere, with the same tile cut down to a four inch base molding and finished with Schluter trim. The floor is Daltile Dove Gray 12 by 24, the shower floor a two inch hexagon, and the curb, both saddles and the vanity backsplash are all Silestone Miami White. The enclosure is a Fleurco Horizon at 60 by 79 inches in polished chrome, over an Infinity Drain four by four in stainless.

The toilet is a Toto Aquia IV close-coupled, fully skirted, dual flush at 1.28 and 0.8 gallons. Its CEFIONTECT glaze and the way the bowl is shaped to reduce flow resistance are the reasons it is both easier to clean and noticeably quieter than what it replaced.

Materials and finishes

Kitchen

ElementSpecification
CabinetsExecutive slab, wall in Chalk White and base in Oregon Pine
Cabinet pullsTop Knobs Europa, 3 in and 5 in
Appliance pullTop Knobs Hartridge, 12 in
CountertopSilestone Ethereal Glow, 3/4 in
BacksplashRoca White Ice Bright, 3 x 6 in, 1/16 in grout joint
Floor tileDaltile Vapor Matte, 12 x 24 in, 1/16 in grout joint
Floor groutLaticrete Light Pewter
Wall groutLaticrete Bright White
RefrigeratorFisher and Paykel RB2470BRV1 integrated, 24 in, panel ready, 69.75 x 21.875 x 21.25 in
Gas rangePremier P20S3102PS freestanding, 20 in
Ventilation hoodSummit HC20SS ductless recirculating, 20 in
DishwasherBosch SPX68C73UC, panel ready
SinkKraus undermount, 20 in, stainless steel
FaucetDelta Essa pull-down, polished chrome
Ceiling lightMaxim Lighting LED, white
Cabinet accessoryRev-A-Shelf pull-out

Bathroom

ElementSpecification
VanityExecutive slab, floating, 24 in, Oregon Pine, 23.5 x 17.5 in
Storage cabinetSemi-recessed into the former hamper opening, Radiant White, push-to-open
Vanity topSwiss Madison ceramic, 24 in, white
Vanity backsplashSilestone Miami White, 6 in high
FaucetGrohe Lineare single hole, single handle, polished chrome, 1.2 GPM
Shower valve, head and spoutGrohe thermostatic, polished chrome
Shower enclosureFleurco Horizon, 60 x 79 in, polished chrome
Shower drainInfinity Drain, 4 x 4 in, stainless
ToiletToto Aquia IV CST446CEMFG close coupled, dual flush 1.28 and 0.8 GPF, skirted
Wall tileRoca Pro Ivory, 12 x 24 in
Floor tileDaltile Dove Gray, 12 x 24 in
Shower floor2 in hexagon
Base moldingWall tile cut to 4 in high, finished with Schluter trim
Curb and saddlesSilestone Miami White
Wall groutLaticrete Bright White
Floor groutLaticrete Sterling Silver
AccessoriesGrohe Essentials paper holder, 18 in towel bar, 12 in grab bar, brush holder and basket
Clothes lineMoen retractable, polished chrome
Mirror24 in diameter, centered to the vanity

Construction

ElementSpecification
Electrical panelNew circuit breaker panel in the hallway outside the kitchen
Panel feedFramed, sheetrocked and spot-plastered soffit over the entrance door and column
Dedicated circuitsRefrigerator, above-range microwave, dishwasher and two GFCI duplex outlets
Floor acousticsGlued acoustical underlayment beneath the tile in both rooms
WaterproofingMembrane to both floors, turned 6 in up the walls, plus shower wall membrane
Shower baseNew lead pan and cement curb in the former tub position

The result

20 inthe widest appliance in the kitchen
1panel, moved out to the hallway
0.8 GPFon the toilet’s light flush

More MyHome projects in Manhattan

Questions this project answers

My apartment trips a breaker whenever I use two appliances. Can that be fixed in a renovation?

Yes, and it is usually the most valuable thing in the job. This apartment got a new circuit breaker panel, relocated to the hallway outside the kitchen with the electrician choosing the exact position on site, fed through a soffit framed over the entrance door and column. From there, dedicated lines run to the refrigerator, the above-range microwave and the dishwasher, and four GFCI duplex outlets were added above the counter. Older apartments trip because one circuit serves the whole kitchen. Separating them is disruptive to do later and cheap to do while the walls are already open.

Can I turn my bathtub into a shower without moving anything?

Usually, yes. This bathroom went tub to shower in exactly the same position: the alcove tub, its drain and the curtain rod came out, and a new lead pan and cement curb went in on the same footprint, with no bench. Because the position did not change, the waste line still ran where it always had, though it was replaced back to the riser anyway along with the hot and cold. The enclosure is a stock 60 by 79 inch glass door rather than anything custom.

There is no medicine cabinet and no space to put one. What are the options?

Look for an opening that already exists. This bathroom had no medicine cabinet and no wall opening for one, but it did have a recessed hamper set into the wall. Rather than cut a new opening into a wall that may carry pipes or studs, the existing hamper opening was reframed to take a semi-recessed storage cabinet with push-to-open doors, and a 24 inch round mirror was centered over the vanity instead. You get the storage and the mirror without opening a wall that was never meant to be opened.

Will my downstairs neighbor hear a new tile floor?

Not if an acoustical layer goes down first. Both the kitchen and the bathroom here had a glued acoustical underlayment installed beneath the tile, on top of the waterproof membrane. It adds a day and a material cost, and it is invisible the moment the tile is laid, which is exactly why it is the thing most often value-engineered out. In a pre-war building with someone directly below, it is the difference between a floor and a drum, and many co-op boards require it.

How do I protect my building’s hallways and keep my neighbors happy during a renovation?

Start with the things that outlast the job. On this project the acoustical underlayment protects the neighbor below permanently, and the new panel means no shared circuits tripping across the line. During the work, the door, its jamb and hardware, the vent cover and the vanity light were all protected rather than replaced. Phone and cable wiring was concealed inside the wall around the doorway instead of being run along the surface, so nothing had to be reopened afterwards.

Planning something like this?

MyHome has renovated apartments, co-ops, condos and townhomes across Manhattan and Brooklyn for more than 25 years. Complete the short questionnaire to start an estimate.

Let’s design your home together

Complete the short questionnaire to kick off your estimation process

Get an Estimate

Recent Projects

Just a moment...