Guest Bathroom Renovation at 17 Thompson Street

Guest Bathroom Renovation at 17 Thompson Street

Designer Preston
Project manager Ofek
Renovation Expert Ben

Projects › Lower Manhattan › 17 Thompson Street

Completed project · Lower Manhattan, New York, NY

A guest bathroom in Lower Manhattan taken back to the studs and rebuilt as a shower, with the bench and the partition wall removed to open it up. The job started with a live leak into the apartment below, so the water stayed off until the branch lines had been replaced back to the building risers.

Renovated guest bathroom with a frameless glass shower, a marble-topped console sink on a brushed nickel frame and a grey hexagonal mosaic floor
The shower enclosure is L-shaped and frameless. The bench and the partition wall that used to divide it from the toilet are both gone.

Job record

Location
Lower Manhattan, New York, NY 10013
Building
17 Thompson Street
Scope
Guest bathroom, rebuilt shower to shower
Brands
Brizo, Toto, Kohler, DreamLine, Ann Sacks, Porcelanosa, Lacava, Lutron, Infinity Drain, Restoration Hardware
Stone
Carrara marble vanity top, curb and saddle
Completed
2026

The bathroom before the work

Cherry paneling floor to ceiling, a travertine floor, a pedestal sink and a marble shower divided from the toilet by a partition wall with a built-in bench. The room worked, but it was closed in, and there was a more pressing problem: water was getting into the apartment below.

Original bathroom with a pedestal sink, cherry wood paneling and a small wall-mounted mirror
Wood paneling ran floor to ceiling on every wall. All of it came out.
Original toilet in the corner against cherry paneling, with a travertine tile floor
The toilet sat in its own alcove beside the shower partition.
Original wall with a towel bar, a wall-mounted radiator at floor level and travertine tile
This radiator stays. It is the reason the new sink had to hang off the wall.
Original bathroom door and cherry panelled wall, with a frosted glass panel beside it
The door, its jambs and its hardware were protected rather than replaced.

The shower was the suspected source. Rather than open the walls speculatively, the job was sequenced so the water stayed off in that bathroom until the plumber had replaced the branch lines, with the client given at least 48 hours notice so the neighbor could be told before anything was turned back on.

Original marble shower enclosure with glass panels taped for protection during works
The tape and the note are the crew marking out the enclosure before demolition.
Original shower wall in heavily veined white marble with a brushed nickel mixer
The old marble was a large-format slab. The replacement is a 47 inch porcelain tile.
Bathroom ceiling showing a square extract vent and two recessed downlights
The vent and the recessed lighting were both protected and kept.
Original shower floor and curb in marble, with the travertine bathroom floor beyond
The old shower had a raised curb and a step. The lead pan under it was replaced completely.
Original built-in shower bench in marble, set behind the glass partition
This bench and the partition wall behind it were both removed to open the room up.

What the crew did, in order

  1. Protect what stays, then strip the room

    The door, its jambs and hardware, the ceiling extract vent, the wall-mounted radiator and the recessed ceiling lights were all protected and kept. Everything else came out: floor tile and saddle, the wood paneling, wall tile, the shower curb, lead pan, glass enclosure, the partition wall and its bench, the toilet, the pedestal sink, the recess-mounted medicine cabinet, the sconce, the outlets and switches, and the shut-off valves.

  2. Find out where the water was going

    With the room stripped, MyHome inspected the risers themselves for cracks and checked for a cracked joist under the floor. Both were written into the scope as inspections to carry out after demolition rather than assumptions made before it, because probing a neighbor’s ceiling is not something to do speculatively.

  3. Replace the plumbing back to the risers

    New hot and cold water lines and new waste and vent lines, run as branch replacements all the way back to the building risers, with new shut-off valves, check valves and water hammer arrestors. If the leak was in the branch lines, this ends it. A pressure-balancing valve went in for the shower.

  4. Rebuild the shower without the bench

    A new lead pan and a cement curb in the same footprint, then a water test on the pan before anything went over it. The bench and the partition wall between the shower and the toilet were not rebuilt, which is what makes the finished room read as one space rather than two.

  5. Waterproof, soundproof, then tile

    Cement board through the shower enclosure, Laticrete 9235 waterproof membrane on the floor turned six inches up the walls and a membrane on the shower walls. A glued soundproofing underlayment went down under the floor tile, which is the kind of thing only the neighbor below ever notices.

  6. One niche, two sconces, one bidet outlet

    A single recessed shampoo niche was framed into the shower wall. The existing sconce was moved and a second was added and spliced onto the same switch. A new outlet was run for the bidet seat, and the switches, dimmer and GFCI outlets were all replaced in their new positions.

The finished room

The walls are a single 47 inch Porcelanosa porcelain in Glem White, run to ceiling height on the sink wall and through the shower. The floor and the shower floor are the same Ann Sacks Bianca Helena marble in a two inch honed hexagon, with the 12 by 24 version of the same stone cut down for the tile baseboards.

Shower interior with a fixed rain head, a sliding-bar handshower and a recessed shampoo niche set into the marble wall
One recessed niche was framed into the wall. There was nowhere to put anything before except the bench.
Console sink with a Carrara marble top on a brushed nickel frame, a mirror above and a linear sconce either side
The sink had to be wall-mounted rather than floor-standing, because the radiator sits directly beneath it.

The sink is the detail worth knowing about. The wall-mounted radiator had to stay, which ruled out anything floor-standing, so the console is cleated to the wall and carries a polished Carrara top over a Lacava undermount basin. The same Carrara was used for the shower curb and the room saddle, so the three pieces of stone match.

Wall-hung style toilet with a concealed seat and a brushed nickel paper holder, on the hexagonal mosaic floor
The toilet went back on the existing rough-in, so no drain was moved for it.
The glass shower enclosure seen from the doorway, showing the hinged door, the niche and the marble curb
The curb is a single piece of polished Carrara, cut to match the vanity top and the saddle.

Fittings are Brizo throughout in Brilliance Luxe Nickel: a Litze widespread faucet with notch lever handles at 1.5 gallons per minute, a pressure-balancing shower valve, a fixed head and a handshower on a slide bar. The enclosure is a DreamLine Unidoor-X frameless hinged door, and the shower drain is an Infinity Drain with a five inch tile-in cover so the mosaic runs across it.

Close view of the shower floor in grey and white hexagonal marble mosaic with a square tile-in drain cover
The drain is a tile-in cover, so the mosaic runs across it and the outlet almost disappears.
The finished bathroom looking toward the sink wall, with both sconces lit and the mirror reflecting the doorway
A second sconce was added and spliced onto the existing switch, so the sink wall is lit from both sides.

Storage was the other thing the paneling had been hiding. There was a recess to the right of the sink concealed behind the cherry boards, and the wall opening for the medicine cabinet had to be re-framed to take the new Kohler Catalan unit, which is deeper than what came out and carries a triple mirror. Grab bars were offered as an option and, like the recessed cabinet, needed blocking cleated into the wall before tiling rather than after.

Materials and finishes

Shower

ElementSpecification
Shower enclosureDreamLine Unidoor-X E3280634L-04, brushed nickel, 58 x 34.375 x 72 in, frameless hinged
Shower valveBrizo R75000 pressure-balancing rough
Shower trimBrizo T75P535-NKLHP, Brilliance Luxe Nickel
Trim handle kitBrizo HL75P39-NK, Brilliance Luxe Nickel
ShowerheadBrizo 81392-NK-2.5, Brilliance Luxe Nickel
Shower arm and flangeBrizo RP71648NK, Brilliance Luxe Nickel
HandshowerBrizo 85735-NK, Brilliance Luxe Nickel, with slider bar, hose and outlet
Shower drainInfinity Drain UCP 42 clamping and CDIQ 42 floor drain, cast iron
Shower drain coverInfinity Drain T 5-SS, satin stainless, 5 x 5 in, tile-in
Shower curb topCarrara marble, polished

Sink, toilet and cabinetry

ElementSpecification
Lavatory sinkLacava 5485 001, white, 19 x 15.5 x 8 in, undermount
Undermount kitLacava 9003
Console frameAnzzi Ventura CS-FRGLPNL00BN, brushed nickel, 36 x 28 x 22 in
Vanity topCarrara marble, polished
Lavatory faucetBrizo Litze 65334LF-NKLHP, Brilliance Luxe Nickel, widespread, low spout, 1.5 GPM
Faucet handlesBrizo HL5339-NK notch lever, Brilliance Luxe Nickel
Lavatory drainBrizo RP72414NK push-button pop-up with overflow
P-trap kitKingston Brass Concord KPK408, brushed nickel
ToiletToto Aquia IV Cube MW4363446CEMFGN#01, cotton, Washlet+ S5, 1.28 and 0.9 GPF
Medicine cabinetKohler Catalan K-2936-PG-SAA, 24.125 x 36.125 x 4.75 in, triple mirror

Tile, stone and finishes

ElementSpecification
Wall tilePorcelanosa Glem White Nature, 47 x 47 in
Floor and shower floor tileAnn Sacks Bianca Helena 2 in hexagon mosaic, honed marble
Tile baseboardsAnn Sacks Bianca Helena 12 x 24 in field tile, honed
Room saddleCarrara marble, polished
Wall and floor groutLaticrete Permacolor Select NS 89, Smoke Grey
Shower floor groutLaticrete Permacolor Select NS 60, Dusty Grey
WaterproofingLaticrete 9235, floor turned 6 in up the walls, plus shower wall membrane
SoundproofingSoundControl QTSCU 4005, 48 x 360 in, 5 mm, glued with Bostik EFA+
PaintSherwin Williams walls, Benjamin Moore Regal Select ceiling and trim

Lighting and electrical

ElementSpecification
Wall sconcesRestoration Hardware Ravelle Linear 10062407 PN, polished nickel, 4.5 x 4.75 x 23 in, two
DimmerLutron Sunnata Pro ST-PRO-N-RW LED+, architectural white
Fan switchLutron Sunnata ST-6ANS-RW, architectural white
GFCI outletsLutron SCR-20-GFST-RW, 20A tamper-resistant, two
Cover platesLutron SC-1-RW and SC-2-RW, satin, architectural white

The result

0benches rebuilt
48 hrnotice before the water went back on
1recessed niche, where there was none

More MyHome projects in Manhattan

Questions this project answers

Water is leaking into the apartment below mine. How does a renovation actually find the cause?

By stripping the room first and looking, rather than guessing. On this job the guest bathroom was the suspected source, so the crew left the water off in that room entirely until the plumbing was rebuilt. After demolition MyHome inspected the building risers for cracks and checked the floor for a cracked joist, both written into the scope as things to establish once the room was open. The new lead pan under the shower was water-tested before anything was laid over it. If the leak was in the branch lines, replacing them back to the risers ends it; if it was the joist or the riser, you now know before the tile goes on instead of after.

How do I protect my building’s hallways and keep my neighbors happy during a renovation?

Protection is written into the scope before anything comes out, and on a leak job it extends to the neighbor directly. Here the client was to be given at least 48 hours notice before water was turned back on, specifically so the apartment below could be warned. Inside the bathroom, the door and its hardware, the ceiling extract vent, the radiator and the recessed lights were all protected rather than replaced. A glued soundproofing underlayment also went down under the new floor, which only the neighbor below will ever notice.

Can you take a bench out of a shower, and is it worth it?

Yes, and on a small bathroom it usually is. This shower had a built-in marble bench and a partition wall dividing it from the toilet. Both were demolished and neither was rebuilt. What you lose is somewhere to sit; what you gain is a room that reads as one space, a full frameless L-shaped enclosure instead of a part-glazed one, and enough wall to frame a recessed niche, which is where everything that used to sit on the bench now lives.

My radiator is in the way of the vanity I want. What are the options?

Hang the vanity off the wall. On this job the wall-mounted radiator sits directly below the sink and had to stay, which ruled out any floor-standing or pedestal unit. The answer was a console cleated to the wall on a brushed nickel frame, with a polished Carrara top and an undermount basin, so the radiator keeps its air gap and stays accessible. It is worth deciding this at design stage: a wall-mount needs blocking in the wall behind it, and that has to happen before the tile.

What are change orders, and how do I avoid being overcharged by my contractor?

A change order is a written amendment to what was agreed. The protection against surprises is that everything is specified before work starts: this bathroom had a materials list naming every item down to the grout color and who was supplying it, MyHome or the client. Where genuine unknowns existed they were named as unknowns rather than priced as certainties. This job is a good example: the scope states plainly that if demolition revealed a cracked joist, probing and repairing it would be an additional charge. You want that sentence in your scope before you sign, not a change order explaining it afterwards.

Planning something like this?

MyHome has renovated apartments, co-ops, condos and townhomes across Manhattan and Brooklyn for more than 25 years. Complete the short questionnaire to start an estimate.

Let’s design your home together

Complete the short questionnaire to kick off your estimation process

Get an Estimate

Recent Projects

Just a moment...