Studio Kitchen, Bathroom and Electrical Upgrade at 308 Mott Street

Studio Kitchen, Bathroom and Electrical Upgrade at 308 Mott Street

Designer Preston
Project manager Ofek
Renovation Expert Ben

Projects › Lower Manhattan › 308 Mott Street

Completed project · Nolita, New York, NY

A 400 square foot studio on the sixth floor of an early 1900s Nolita walk-up, with the kitchen and the bathroom done together. A freestanding cast-iron tub came down six flights and a shower went in where it had stood. The kitchen kept its layout and gained a filed electrical upgrade, from a fuse box to a permitted circuit breaker panel. Every appliance, tile and fitting below is the one that was specified and installed.

The finished kitchen at 308 Mott Street with Fabuwood Illume Tuscany cabinets in Azul Marino, a Caesarstone Blizzard counter, a Daltile Arctic White subway backsplash and a stainless hood
After: navy shaker against white subway, with the brick still showing.

Job record

Project
Studio kitchen renovation, bathroom tub-to-shower conversion and a filed electrical upgrade
Location
308 Mott Street, Nolita, Manhattan, NY
Building
Early 1900s studio condo, sixth-floor walk-up, joist-construction floors and ceilings
Apartment
400 sq ft
Completed
2025 to 2026
Kitchen layout
Unchanged. Cabinets went back on the same layout at a similar height
Bathroom layout
The tub became a shower on the same footprint; the sink moved to a new wall
Electrical
Major permit and load letter filed, new circuit breaker panel, original fuse box retained as a splice box
Scope
Kitchen renovation · Bathroom renovation · Tub-to-shower conversion · Electrical upgrade · Plumbing branch replacement · Waterproofing · Soundproofing · Floor and wall tile · Cabinetry · Stone · Painting
Design
Materials lists last updated 25 November 2025 · Designer Preston

The starting point: metal cabinets and a cast-iron tub

The kitchen was white metal wall cabinets fixed to exposed brick, a 20 inch freestanding range, and a counter with room for one thing at a time. The bathroom still had its freestanding cast-iron rolltop tub, a wall-mount sink, a tank toilet and white tile with a black band running through it at chest height. Both rooms worked. Neither had been touched in a long time, and the apartment was still on a fuse box.

Before renovation: the original kitchen at 308 Mott Street with a 20 inch white freestanding gas range, white metal cabinets and a small butcher block counter
Before: a 20 inch range, and a counter you could not put two things on.
Before renovation: the original white metal wall cabinets and stainless range hood at 308 Mott Street, against exposed brick
Before: metal wall cabinets, and the brick they were fixed to.
Before renovation: the kitchen wall cabinets at 308 Mott Street seen against the exposed brick and the window
Before: the run stopped where the brick started.
Before renovation: the refrigerator corner of the original studio kitchen at 308 Mott Street
Before: the fridge, in the corner it kept.
Before renovation: the far corner of the studio at 308 Mott Street with a clothes rail against the exposed brick
Before: in 400 square feet the kitchen is also the hallway.
Before renovation: the original bathroom at 308 Mott Street with a freestanding cast-iron rolltop tub, a wall-mount sink and a tank toilet
Before: a cast-iron rolltop tub, on the sixth floor of a walk-up.
Before renovation: the cast-iron rolltop tub at 308 Mott Street with a curtain rail and the basketweave tile floor
Before: the tub that had to come down six flights.
Before renovation: the shower head and curtain over the cast-iron tub at 308 Mott Street
Before: a shower head over a tub, behind a curtain.
Before renovation: the tank toilet and the white wall tile with its black accent band at 308 Mott Street
Before: white tile with a black band running through it.
Before renovation: the wall-mount sink and tank toilet at 308 Mott Street above the basketweave tile floor
Before: the wall-mount sink, in the position it did not keep.
Before renovation: the original bathroom at 308 Mott Street looking toward the window, with the curtain rail and the toilet
Before: the window, the rail and the tub, all in one narrow room.
Before renovation: the black accent band running through the white wall tile at 308 Mott Street beside the door
Before: the band, at the height it ran round the room.
Before renovation: a corner caddy of toiletries hanging on the white tile at 308 Mott Street
Before: storage, such as it was.
Before renovation: the tall narrow recessed medicine cabinet at 308 Mott Street in the white tiled wall
Before: the recessed cabinet that came out.
Before renovation: the bathroom window at 308 Mott Street with an exposed vertical pipe running past it
Before: the window, and the pipe that runs past it.

What the crew did, in order

  1. Get everything up six flights

    There is no elevator. Every cabinet, the stone, the appliances and the tile went up six flights by hand, and the cast-iron tub came down the same way. On a walk-up this sets the schedule more than anything that happens in the apartment.

  2. Strip both rooms

    The kitchen lost three wall cabinets and two base cabinets, the countertops, the sink, faucet, shut-off valves and branch lines, the ceiling light, the above-counter quad outlet and switch, a 20 inch freestanding gas range and a 24 inch recirculating hood. The bathroom lost its floor and wall tile, the freestanding cast-iron tub, the wall-mount sink, the toilet, a recessed tall medicine cabinet, a surface-mount cabinet, the ceiling light and the hot, cold, waste and vent branch lines.

  3. File the electrical permit

    This is the part of the job that took the longest and shows the least. A major electrical permit was pulled with a load letter, and inspections and sign-offs were coordinated. A new circuit breaker panel went into a code-compliant location nearby, and the original fuse box stayed in place as a splice box rather than being ripped out.

  4. Run the new circuits

    Dedicated lines went to the refrigerator, the range hood, two above-counter GFCI duplexes and a quad, with an added outlet near the fridge and a gas ignition outlet. One more dedicated line was run the length of the apartment to a 20 amp GFCI duplex beside the bathroom sink.

  5. Replace the branch lines

    New shut-off valves, check valves and water hammer arrestors went in, with hot, cold, waste and vent lines run back to the risers. The bathroom sink was going to a new position beside the shower, so its supply and waste had to be re-run rather than reconnected.

  6. Waterproof, then tile

    A Laticrete waterproof membrane went down on the bathroom floor and up the walls six inches, with membrane on the shower enclosure walls as well. Acoustical underlayment went down before any tile. The floor took Tilebar Cascais in White Ornate at nine inches, the shower floor took Daltile penny round in Arctic White, and the walls took Daltile Arctic White 3 by 6 to roughly eight feet in the shower and four feet outside it.

  7. Build the shower where the tub was

    A lead pan and curb were set in the tub’s old footprint and cement board went up in the enclosure. The walls were resurfaced where they needed it first.

  8. Set the cabinets and the fittings

    Fabuwood Illume Tuscany went in in Azul Marino, on the same layout as the cabinets that came out and at a similar height. The Caesarstone Blizzard counter and backsplash were templated to it. Every visible fitting in both rooms is matte black, and the same Arctic White 3 by 6 tile with matte black Schluter trim runs in the kitchen backsplash and the bathroom.

The kitchen

The finished kitchen at 308 Mott Street from the far end, with the range, the black Delta faucet and the Caesarstone Blizzard counter against exposed brick
From the far end, where the kitchen meets the rest of the studio.
The finished kitchen run at 308 Mott Street with the gas range, navy base cabinets and Top Knobs flat black bar pulls
The run is the same length it always was. It holds more.
The Delta 16879-BL faucet in matte black at 308 Mott Street over the Blanco stainless sink, against the white subway backsplash and the window
A black faucet on a white counter, in front of a Nolita window.

The bathroom

The finished bathroom at 308 Mott Street with the lit mirror, the black framed shower panel and the Delta towel ring
The mirror, the panel and the trim line, all reading as one black.
The finished bathroom at 308 Mott Street with a wall-hung basin, an exposed matte black trap, a TOTO Drake toilet and the Tilebar Cascais patterned floor
After: the sink moved, and nothing under it to clean around.
Close view of the wall-hung basin and the Delta Trinsic faucet in matte black at 308 Mott Street against the white subway tile
Every fitting in the room is the same matte black.
The shower at 308 Mott Street with a 10 inch Delta raincan head in matte black, a Schluter corner shelf and the glass panel
The shower stands where the cast-iron tub stood.
The shower enclosure at 308 Mott Street seen from outside, with its black framed glass panel and two Schluter matte black corner shelves
A fixed panel rather than a door, because the room is too narrow for a swing.

Materials and finishes

Kitchen

ElementSpecification
CabinetryFabuwood Illume Tuscany, shaker door, in Azul Marino
Cabinet hardwareTop Knobs M1017 Pennington bar pull in flat black, 5 1/16 in centres
Countertop and backsplash stoneCaesarstone 2141 Blizzard, 3 cm
Backsplash tileDaltile Color Wheel 019036MOD1P4 in Arctic White, 3 by 6 in, with Schluter A80MGS trim in matte black
SinkBlanco 443050 stainless steel in satin polish, 20 by 16 by 9 in, with a 440007 strainer
FaucetDelta 16879-BL-DST in matte black
Ceiling lightKuzco KUZ2615206 Arnold CCT LED five-light track in matte black, 35.13 in
Switches and outletsLutron Claro in white: CAR-15-GFST-WH GFCI, CARS-15-TR-WH outlets and an ST-PRO-N-WH Sunnata Pro dimmer
AppliancesRefrigerator, gas range and range hood, all client supplied and installed in their existing positions
GroutLaticrete Permacolor Select NS 60 in Dusty Grey

Bathroom

ElementSpecification
Wall tileDaltile Color Wheel 019036MOD1P4 in Arctic White, 3 by 6 in, with Schluter A80MGS trim in matte black
Floor tileTilebar Cascais in White Ornate, 9 by 9 in
Shower floor tileDaltile Color Wheel 0190PNYRDMSGL penny round in Arctic White, 1 in
Corner shelvesSchluter SES2D5MGS pentagon corner shelf in matte black, 8 1/4 in, two
Shower valve and trimDelta R10000-UNBX body with Trinsic Monitor 17 Series T17059-BL trim in matte black
ShowerheadDelta RP103694BL modern single-setting raincan, 10 in, on an RP46870BL 16 in arm with an RP6025BL flange, all matte black
BasinNameek’s Scarabeo 5002 Teorema rectangular ceramic basin in white, 23.62 in, wall hung in a new position beside the shower
Basin faucetDelta Trinsic 559LF-BLLPU in matte black at 1.2 gpm, with an RP101632BL push-pop drain and a Kingston Brass KPK400 trap and supply kit in matte black
ToiletTOTO CST775CEFG#01 Drake two-piece, round front, 1.28 gpf, with a THU808#01 actuator and SS113#01 seat in Cotton
Medicine cabinetFleurco MCHS1936-14 in sandblasted aluminium, 19 by 36 in
Ceiling lightAFX Lighting AFX2222385 in black, 20 in
Stone saddleCaesarstone 2141 Blizzard, 3 cm
AccessoriesDelta Trinsic 759240-BL towel bar and towel ring in matte black
Switches and outletsLutron in Snow: SCR-20-GFST-SW 20 amp GFCI and an ST-PRO-N-SW Sunnata Pro dimmer
SoundproofingSoundControl QTSCU 4005 acoustical underlayment, 5 mm
PaintBenjamin Moore Chantilly Lace OC-65, Aura Bath and Spa on the walls, matched to the existing paint
GroutLaticrete Permacolor Select NS 60 Dusty Grey on the walls, 9 Frosty on both floors

The result

400 sq ftthe whole apartment, kitchen and bathroom included
6flights, no lift, for every cabinet in and the cast-iron tub out
1fuse box replaced by a permitted circuit breaker panel

More MyHome projects in Lower Manhattan

Questions people ask about renovating a small pre-war apartment

Can you replace a fuse box in a pre-war apartment?

Yes, and it is a filed job rather than an afternoon. A major electrical permit was pulled here with a load letter, and inspections and sign-offs were coordinated before anything was closed up. The new circuit breaker panel went into a code-compliant position nearby and the original fuse box was left in place as a splice box, which is normally cheaper and less destructive than chasing every old run back to a new location.

What happens to a cast-iron tub in a sixth-floor walk-up?

It comes down the stairs. A freestanding cast-iron rolltop tub is the single heaviest thing in a bathroom like this, and in a building with no elevator the removal is a scheduled piece of work in its own right. Everything that replaced it went up the same six flights.

Can a bathroom sink be moved to a different wall?

It can, provided the supply and waste can reach the risers. This sink moved to a new position beside the shower, so new hot, cold, waste and vent lines were run rather than reconnected. That is what makes moving a fixture a different job from replacing one, and it is why the answer depends on where the risers are rather than on how far you want to move it.

Does a 400 square foot studio need a full gut?

This one did not. The kitchen cabinets went back on the same layout at a similar height, and both rooms kept their footprints apart from the tub and the sink. What was replaced was everything behind the finishes: the branch lines, the electrical service and the waterproofing. In a small apartment that is usually the better trade, because a changed layout costs space you do not have.

Why use one finish across a whole small apartment?

Every visible fitting in both rooms here is matte black, and the same Arctic White 3 by 6 tile with matte black trim runs in the kitchen backsplash and the bathroom. In 400 square feet you see two rooms at once from most of the apartment, so a single finish reads as deliberate where a second one reads as a seam.

Planning something like this?

MyHome has renovated apartments, co-ops, condos and townhomes across Manhattan and Brooklyn for more than 25 years. Complete the short questionnaire to start an estimate.

Let’s design your home together

Complete the short questionnaire to kick off your estimation process

Get an Estimate

Recent Projects

Just a moment...