Kitchen, Primary Bathroom and Powder Room at 15 West 53rd Street

Kitchen, Primary Bathroom and Powder Room at 15 West 53rd Street

Designer Rejla
Project manager Adam
Renovation Expert Ben

Projects › Midtown West › 15 West 53rd Street

Completed project · Midtown West, New York, NY

A galley kitchen, a primary bathroom and a powder room on the twenty-ninth floor, renovated together with the circuit breaker panel and every branch line replaced. The bathroom lost one tub and gained another, with five grab bars in the same Kohler Purist line as the showerhead. The kitchen gave up appliance width to buy back cabinetry. Every appliance, tile and fitting below is the one that was specified and installed.

The finished galley kitchen at 15 West 53rd Street with Lauriermax maple slab cabinets, a Cambria Malvern counter, reeded glass upper doors and a full-height veined slab on the end wall
After: a galley, with the end wall doing all the talking.

Job record

Project
Galley kitchen, primary bathroom, powder room and a circuit breaker panel replacement
Location
15 West 53rd Street, Midtown West, Manhattan, NY
Building
Twenty-ninth floor apartment
Completed
2023
Primary bathroom
Tub to tub, on the same footprint, with five grab bars and a transfer valve
Permits
Plumbing LAA and an electrical permit, with inspections and sign-offs
Accessibility
Three 18 in and two 36 in grab bars, a handshower on a slide, and a transfer valve
Scope
Kitchen renovation · Primary bathroom renovation · Powder room renovation · Circuit breaker panel replacement · Plumbing branch replacement · Waterproofing · Soundproofing · Floor and wall tile · Cabinetry · Stone · Lighting · Painting
Photography
No before photographs were supplied for this job

What the crew did, in order

  1. Pull the permits first

    A plumbing LAA and an electrical permit were filed, with inspections and sign-offs coordinated. On a twenty-ninth floor apartment where the branch lines and the panel are both being replaced, that filing is the job’s critical path rather than a formality.

  2. Strip three rooms

    The kitchen lost a decorative soffit, all its cabinets, countertops, backsplashes, floor tile, baseboards and saddle, the sink and its branch lines, a built-in wall oven, a 30 inch gas cooktop, a recirculating hood and the refrigerator. The primary bathroom lost its floor and wall tile, vanity, tank toilet, a bidet toilet, medicine cabinets, a sconce and every branch line. The half bathroom came out with it.

  3. Replace the circuit breaker panel

    A new panel went into the existing position, with dedicated lines run to the refrigerator, the built-in microwave, the dishwasher and two GFCI locations. Above-counter GFCI duplexes were spliced in at code-compliant spacing, every four feet. A dedicated line ran to the GFCI beside the primary bathroom sink. Walls were channelled and spot-plastered wherever a new run went in.

  4. Replace every branch line

    New shut-off valves, check valves, water hammer arrestors and hot, cold, waste and vent lines were run back to the risers in all three rooms. A quarter inch rigid looped copper icemaker line with an air arrestor was run on a half inch rough, and the dishwasher went in on a check valve next to the sink.

  5. Waterproof and soundproof

    Laticrete membrane went down on the kitchen and bathroom floors and six inches up the walls, with membrane taken to ceiling height on the tub enclosure walls. Soundproofing underlayment went down before tile in both rooms.

  6. Build the wall that carries the kitchen

    Large format tile and metal strips went on the back wall of the kitchen as a single full-height surface rather than a counter-height backsplash, and the remaining backsplashes were prepared for slab. Cement board went into the tub enclosure and a built-in niche was constructed.

  7. Set the cabinets, the stone and the fittings

    Lauriermax maple slab cabinetry went in to the kitchen design, with Cambria Malvern on the counters. The primary bathroom took an Executive maple vanity in London Fog under a Cambria Winterbourne top, with Caesarstone Jet Black used as edging throughout. Five Kohler Purist grab bars went in, three at 18 inches and two at 36.

  8. Light it and finish

    Seven ceiling and wall lights were replaced on their existing points along with switches and dimmers, two hardwired smoke and carbon monoxide detectors went in, and Richelieu LED strips were run under the cabinets on a 24 volt driver with an RF remote and a dimmer for each side of the galley. Then spot-plaster, prime and two coats.

The kitchen

The finished kitchen at 15 West 53rd Street looking through to the hallway, with the Bosch gas cooktop on the left and the sink run on the right
Cooktop on one side, sink on the other, and a door at the end.
The full-height veined slab on the end wall of the kitchen at 15 West 53rd Street, with the Bosch speed oven set into the cabinetry beside it
The end wall is one continuous slab, not a backsplash.
Close view of the veined slab and the linen-textured tile meeting at the end wall of the kitchen at 15 West 53rd Street
Two surfaces meeting, with a metal strip between them.
The Bosch HMC87152UC speed oven built into the cabinet run at 15 West 53rd Street beside the slab wall
The wall oven came out. A built-in speed oven went in its place.
The Bosch NGM5458UC 24 inch gas cooktop at 15 West 53rd Street set into the Cambria Malvern counter, under the Asti hood
A 24 inch cooktop, down from the 30 inch that came out.
Close view of the Bosch 24 inch gas cooktop and the Cambria Malvern counter at 15 West 53rd Street
The counter runs past the cooktop without a seam.
The Bosch speed oven at 15 West 53rd Street set flush into the maple slab cabinetry
Flush into the run, with no frame around it.
The Solera stainless undermount sink and Kohler Purist pull-out faucet in matte black at 15 West 53rd Street
A black faucet, in a kitchen that is otherwise all stone and pale wood.
The mitred corner where the counter meets the cabinetry at 15 West 53rd Street, with a metal trim strip
The detail that decides whether a slab wall looks built or applied.
The finished kitchen at 15 West 53rd Street from the far end, with the sink run, reeded glass uppers and under-cabinet lighting
From the far end. The uppers are reeded glass, lit from beneath.

The primary bathroom

The primary bathroom at 15 West 53rd Street in Florim Royal Marble, with the Executive vanity in London Fog, a Cambria Winterbourne top and the tub beyond
After: the tub came out and another tub went in.
The primary bathroom vanity at 15 West 53rd Street with the Kohler Verticyl undermount basin, a Kohler Composed faucet and mirrors to the ceiling
Mirrors run to the ceiling, which is the cheapest way to widen a narrow room.
Close view of the Kohler Verticyl round undermount basin and Composed single-handle faucet in polished chrome at 15 West 53rd Street
Undermount, so nothing sits proud of the Cambria top.
The Kohler Tea-for-Two tub at 15 West 53rd Street with Purist grab bars, a Composed wall-mount filler and the handshower on its slide
Five grab bars went in across this bathroom. This is two of them.
The Kohler Purist showerhead and handshower in polished chrome at 15 West 53rd Street against the polished Royal Marble wall
A fixed head and a handshower, both on the transfer valve.
The primary bathroom at 15 West 53rd Street looking toward the toilet and the glass panel, with the towel bar and grab bar on the marble wall
The glass is a panel rather than a door, so nothing swings into the room.

The powder room

The powder room at 15 West 53rd Street with printed wallpaper panels set behind black framed glazing above the vanity
The powder room is the one room in the apartment that is not stone.
The powder room vanity at 15 West 53rd Street with an undermount basin, a black faucet and the framed wallpaper panels behind
Black frames, black tap, and a pattern behind glass.
The powder room at 15 West 53rd Street seen end to end, with the framed panels running the full height of both walls
End to end. The panels run floor to ceiling on both sides.

Materials and finishes

Kitchen

ElementSpecification
CabinetryLauriermax, maple slab door
CountertopsCambria Malvern, polished
Wall and floor tileFlorim Industrial Ivory 24 by 48 in matte on the floor, with Florim Reve Blue matte run vertically on the end wall and metal trim strips between
CooktopBosch NGM5458UC 500 Series, 24 in gas, stainless
OvenBosch HMC87152UC 800 Series, 27 in speed oven, stainless
RefrigeratorBosch B09IB91NSP, 24 in built-in, panel ready
DishwasherBosch SHVM78Z53N, 24 in, panel ready
Range hoodAsti EAS428S1, 28 in, stainless
SinkSolera S3281 stainless single bowl, 23 by 17 in, with an ST-S strainer
FaucetKohler K-7506-BL Purist pull-out in matte black
Under-cabinet lightingRichelieu 24 V LED strips at 78 3/4 in and 9 11/16 in with aluminium channel, end caps and mounting clips, on an X-Driver with CM2-XD RF control and remote
Switches and outletsLutron Claro in white: CAR-15-GFST-WH GFCI, CARS-15-TR-WH appliance outlets and DVCL-153P-WH Diva dimmers, one for each side of the galley
GroutTEC AccuColor sanded in Birch on the floor

Primary bathroom

ElementSpecification
Wall and floor tileFlorim Royal Marble, polished on the walls and matte on the floor
VanityExecutive in maple with a London Fog wash
Vanity topCambria Winterbourne
EdgingCaesarstone 3100 Jet Black, used as edging throughout
BasinKohler K-2883 Verticyl round undermount in white
Basin faucetKohler K-73050-7-CP Composed single handle in polished chrome
TubKohler K-850-0 Tea-for-Two, 60 by 32 in, with a K-78440-NA cable drain and K-23857-CP trim
Tub fillerKohler K-73120-CP Composed wall-mount
Shower valve and trimKohler K-11748-K-NA Rite-Temp pressure balance with K-T73117-3-CP Composed trim, and a K-728-K-NA Mastershower transfer valve with K-T73140-3-CP trim
Showerhead and handshowerKohler K-22170-G-CP and K-22178-G-CP Purist at 1.75 gpm, polished chrome
Grab barsKohler Purist, three K-11892-S at 18 in and two K-11895-S at 36 in, polished chrome
ShelvingKohler K-97623-SHP Choreograph 21 in floating shelves, four
Shower enclosureVigo VG6041CHCL6066 Elan, chrome
AccessoriesKohler Composed in polished chrome: K-73142-CP and K-73145-CP towel bars, K-73146-CP double robe hook and K-73147-CP pivoting tissue holder
SconcesShades of Light BS18174 PN modern milky globe, three, in polished nickel
Switches and outletsLutron Claro in white with a DVCL-153P-WH Diva dimmer
PaintBenjamin Moore, semi-gloss on the ceiling

The powder room finishes were not recorded in the binder supplied for this job. Specification not available

The result

5grab bars, in the same Purist line as the showerhead
24 incooktop, down from 30, to buy back cabinet run
4 ftthe code spacing every above-counter GFCI was set to

More MyHome projects in Manhattan

Questions people ask about renovating a high-floor apartment

Can a bathroom be made accessible without looking like it?

This one is the argument that it can. Five Kohler Purist grab bars went in, three at 18 inches and two at 36, along with a transfer valve, a handshower on a slide and a tub chosen for how you get into it. They are the same Purist line as the showerhead and they are in the same polished chrome as everything else in the room, so they read as fittings rather than as equipment.

Why replace a tub with another tub?

Because a tub is worth keeping if anyone in the household wants one, and because a tub-to-shower conversion needs a new drain line while a tub-to-tub swap usually does not. The old tub came out and a Kohler Tea-for-Two went in on the same footprint, with a new filler, valve, showerhead and handshower, and new hot, cold, waste and vent lines back to the risers.

Is a full-height slab wall better than a backsplash?

It is a different decision, not a better one. The kitchen here runs large format tile with metal strips as one continuous surface on the end wall rather than stopping at the underside of the cabinets. In a galley you look straight down the room at that wall, so it is the surface most on view. Counter-height backsplashes elsewhere in the kitchen were prepared for slab instead.

What does replacing a circuit breaker panel involve in an apartment?

A filed electrical permit, a new panel in the existing position, dedicated lines to each major appliance, and GFCI outlets spliced in at code spacing of every four feet above the counter. Walls get channelled and spot-plastered wherever a new run goes in, which is why panel work usually pulls painting into the job whether or not you planned it.

How small can kitchen appliances go before it stops being worth it?

There is a floor, and this kitchen sits close to it deliberately. A 30 inch cooktop became 24 inches and a built-in wall oven became a 27 inch speed oven set into the run, which bought back cabinetry in a galley where the two sides are within arm’s reach of each other. The refrigerator and dishwasher are both panel ready at 24 inches, so the only appliance you see is the cooktop.

Planning something like this?

MyHome has renovated apartments, co-ops, condos and townhomes across Manhattan and Brooklyn for more than 25 years. Complete the short questionnaire to start an estimate.

Let’s design your home together

Complete the short questionnaire to kick off your estimation process

Get an Estimate

Recent Projects

Just a moment...